The loan was approved for the repayment period of 20 years, with a five-year long grace period.
The project consists of several smaller and medium large investment plans, including the construction of new sections of roads and lanes for slow vehicles, reconstruction of the asphalt layer, elimination of black points and repair of tunnels and bridges, with the aim of improving traffic security on 35 sections of main roads in the FBiH, in the total length of 290 kilometers.
(Source: klix.ba/photo: gradjevinarstvo.ba)