Other roads with the current works are the following: Highway A-1 Zenica south-Kakanj (in Donji Ticici), then main roads: M-17 Jablanica-Mostar, M-17 Ilidza-Blazuj, M-16 Porice-Kupres and M -6.1 Mostar-Siroki Brijeg, as well as the main roads in Zivinice (M-18) and Sanski Most (M-15).
At Bosanski Brod, at the entrance to BiH, the retentions are from 30 to 60 minutes, while at the rest of the border crossings it is not longer than 30 minutes.
Due to works in the territory of Croatia, the traffic is occasionally being slow down at the border crossings Bosanski Brod-Slavonski Brod and Orasje-Zupanja.
(Source: N1)