The value of the agreement amounts to 1.757.780,00 Euros, and the funds have been provided by grants from the European Investment Bank (EIB). The deadline for the construction of the main project is 14 months from the signing of the contract.
The length of these sub-sections amounts to nearly 11 kilometers.
The main design in this section shall be the longest and biggest bridge on Corridor VC.
(Source: Fena)