By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Take a Look at Progress of A1 Highway from Air (Video)
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Take a Look at Progress of A1 Highway from Air (Video)
BUSINESS

Take a Look at Progress of A1 Highway from Air (Video)

Published July 29, 2019
Share
SHARE

A public company Motorway of Federation of Bosnia and Herzegovina has released a video showing the progress of works on Svilaj Bridge on the Sava River from the air and the part of A1 motorway between Sava and Odzak.

“All works on the section Svilaj – Odzak 10.7 km long have been completed. This section will gain real value only by building the Svilaj international bridge under the jurisdiction of the State Ministry of Transport and Communications and the border crossing Svilaj under the jurisdiction of the Indirect Taxation Authority of BiH. The ssection is strategically important not only for the improvement of road infrastructure but also for regional cooperation and better communication with the EU,” was stated from FBiH Highway.

At the beginning of July, the FBiH Motorway said that around 80 percent of the works on Svilaj Bridge were completed, Klix.ba news portal reports.

The construction of Svilaj – Odzak costed 69.2 million euros with VAT, and the works were financed by the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD), the grant of WBIF and own resources of PP Highway FBiH.

The Pace of Solving War Crimes Cases in BiH has recently been slowing down

Animal Protection Center in Mostar is taking care of 70 different Dogs

Europeans fear that Artificial Intelligence will threaten Jobs

Company Enchantress Ambiances from Saudi Arabia to invest in BiH

Import of Pigs in BiH is controlled due to African Swine Fever

TAGGED:#BiH#highway#progress
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Twelve Planes with Pilgrims from BiH to depart to Medina in next Four Days
Next Article Sarajevo marks the 26th Anniversary of Excavation of the Tunnel of Hope
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Monitoring Coalition published Key Findings from Election Day Observation
November 23, 2025
PM Nihad Uk: Education as a Priority, more than 200 Million BAM has been invested
November 23, 2025
Titanic Passenger’s Pocket Watch sold for Record highs
November 23, 2025
CEC BiH: 9.76 Percent of Voters voted by 11 am
November 23, 2025
The Old Town Of Bjelaj – The Fortress That Still Guards The Petrovacko Field
November 23, 2025
Dodik met with Vucic, Saying That They ‘Stand Shoulder To Shoulder’
November 23, 2025
Bjelasnica In The Final Phase Of Preparations: Everything Ready For The Opening Of The Winter Season
November 23, 2025
G20 Leaders adopt Declaration on Climate Change Crisis
November 23, 2025
BiH’s Foreign Trade Deficit Reached 10.8 Billion BAM Despite Export Growth
November 23, 2025
RCC: Lowering Prices and Abolishing Roaming are among the greatest Successes of Regional Cooperation
November 23, 2025
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?