By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Approved Construction of Two Wind Plants in Bosnia-Herzegovina
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Approved Construction of Two Wind Plants in Bosnia-Herzegovina
BUSINESS

Approved Construction of Two Wind Plants in Bosnia-Herzegovina

Published: February 20, 2020
Share
SHARE

 

Federal Government has adopted information on activities in the process of issuing the energy permit and has given the Federal Ministry of Energy, Mining and Industry prior approval in the procedure of issuing this permit to the company IvEvik from Sarajevo for the construction of the Ivovik wind farm, with an installed capacity of 84 MW (42×2 MW), approved power connection of 84 MW (42×2 MW), planned annual electricity production of 236,631 Gwh, whose construction is foreseen at the western edge of Tomislavgrad municipality and the eastern edge of Livno municipality.

Information on the activities in the process of issuing the energy permit was adopted and prior approval was given to the Federal Ministry in the process of issuing this permit to the founding company HB Wind for the construction of the Orlovaca wind power plant, installed rated power 42.9 MW (13×3.3 MW), approved connection power 42. 9 MW (13×3.3 MW), planned annual electricity production of 99.06 Gwh at the Orlovača site in the Livno area, according to a statement from the Federation of Bosnia-Herzegovina Government.

Investment from Azerbaijan will revive Srebrenica!
House for the Socially vulnerable to be built in Busovaca
Three Gold Medals for the Quality of Sarajevo Beer
Authorities fulfilled the Conditions of the IMF because it is in Their Interest
BH Telecom Enters Area of E-Health
TAGGED:#farm#local#news#windBosniaBusiness
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Football Team of Bosnia-Herzegovina ranks 49th in the new FIFA Rankings
Next Article Federal Government allocated 30 Million BAM for Three Hospitals in Bosnia-Herzegovina
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

EU Delegation Condemns Amidzic’s Speech: Incendiary Statements Addressed to Zijad Krnjić and Bosniaks Unacceptable
May 20, 2026
World Cup Fever Grips BiH as Sticker Mania Unites Generations
May 20, 2026
Krnjic: Chauvinistic and Islamophobic Statements show Amidzic’s true Face
May 20, 2026
Slovenian Journalists expose Network of Suspicious Transactions behind Viaduct Affair
May 20, 2026
Minister Amidzic after the Opening of the New Border Crossing: Political Victory of Republika Srpska
May 20, 2026
Preparations underway for the Signing of the Southern Interconnection Agreement in Washington
May 20, 2026
Why It Is Impossible to Change the BiH Constitutional Court without Changing the State Structure
May 20, 2026
Lucic: Croats Will Fight for Their Entity or Croatian Republic of Herzeg-Bosnia If Their Rights Aren’t Met
May 20, 2026
BiH opens New Border Crossing for all International Passenger and Goods Traffic
May 20, 2026
Inside the Royal Fortune: Who Makes the Most Money in the Royal Family?
May 19, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?