By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: BiH plans to realize the Project of Floating Solar Power Plants
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > BiH plans to realize the Project of Floating Solar Power Plants
BUSINESS

BiH plans to realize the Project of Floating Solar Power Plants

Published: April 18, 2023
Share
SHARE

Elektroprivreda BiH, electric utility company, plans to realize the project of floating solar power plants for which the Modrac lake is suitable, as well as the Sniježnica hydroaccumulation, Samir Selimović, executive director for production of Elektroprivreda BiH, announced at this year’s SET.

“We are aware that we have to move quickly in that direction. Thermal power plants cannot balance the power system. They are intended for the base system. You cannot turn off the thermal block during the day and turn it on at night. We are solving that problem with Hydroelectric Power Plants on the Neretva. Then there are Jablanica, Grabavica and Selakovac, which successfully meet the balancing requirements in our system, but we also provide this service for other users,” added Selimović, writes eKapija.

He points out that it is important to mention that Elektroprivreda BiH together with the EBRD is developing a project for Block 3 at the Tuzla TPP, which should be completed by the end of this year, as well as for its conversion to biomass for the production of “exclusively and only thermal of energy”.

“Until now, we have conducted pilot projects and tested the co-combustion of biomass and coal at all or almost all block units in TE Tuzla and TE Kakanj, so we worked with regimes of 5, 10, 15 and 20% biomass in co-combustion with coal. The question arises, is there enough biomass? The answer is – there is none. We are taking significant measures on the degraded surfaces of surface mines. We are already establishing biomass plantations, and we will also use other alternative fuels such as RDF. These are all plans that we are developing.”

He adds that Elektroprivreda BiH is currently developing a very large number of projects related to renewable sources.

“These are solar power plants that are in the stage of creating conceptual projects, several tenders have already been announced. We are planning them on degraded mining areas, where the conditions for obtaining documentation are much better, because this is our land as part of the EPBiH Concern. We want to use those areas as well and bring them to some final intention. In this case, it is solar energy production. We are going in the direction of purchasing projects of renewable sources,” concluded Selimović.

Third ‘Chestnut Festival’ opened in BiH City
Sarajevo City Hall: Burned to the Ground 30 Years ago
500 Families to be supported by the Increase in export of Meat
Controls on Border Crossings raised to a higher Level
ITA BiH Collected 383 Million BAM More Compared to the last Year
TAGGED:#bosnia#electricity#floating#news
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article EU donated Medical Equipment to Hospital in Bihac
Next Article What Are The Risks Of Option Trading?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

The CS MoI thanked the Citizens after the Parade of Police Forces
September 20, 2026
Two Persons arrested over Money Forging in BiH
September 20, 2026
Two Bronze Medals for BiH Karate Athletes at Youth League Tournament in Mexico
September 20, 2026
The Price of Tickets for the Match with Romania is in advance from Tomorrow
September 20, 2026
Bosnia and Herzegovina still has 756 Square Kilometers under Mines
September 20, 2026
Puerto Flamenco Kicks Off Its Tour in Bosnia and Herzegovina with Ovations
September 20, 2026
Arnautovic: Our Citizens Voting Outside BiH Must Be Automatically Registered by the State
September 20, 2026
Srebrenica Memorial Center Presents Good Practices from Bosnia and Herzegovina to Activists from Ukraine
September 20, 2026
CBBiH: Orders worth almost 67.7 Million BAM were settled through Instant Payments
September 20, 2026
Dobor Tower in Bosnia and Herzegovina left to decay
September 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?