By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: A modern Road with four Lanes to be built in Sarajevo
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > A modern Road with four Lanes to be built in Sarajevo
BUSINESS

A modern Road with four Lanes to be built in Sarajevo

Published: October 12, 2016
Share
SHARE

grbavicaConstruction of the south longitudinal has continued in Sarajevo and works are currently in progress near the stadium Grbavica. Contractors are the consortium of domestic companies Euro-Asfalt and ŽGP. According to the Directorate for Roads of the Sarajevo Canton, 900 meters of the road will be built and deadline for completion is one year.

The biggest problems at this section of the south longitudinal are traffic and installations.

“There are many installations that need to be replaced, and utility enterprises will be in charge of that. Also, an elaborate on the change in the traffic regime is being prepared,” said Alma Zilić, expert associate in the Directorate for Roads of the KS.

Second section of the south longitudinal includes construction of the road from Hamdije Čemerlića Street to the intersection of the streets Azize Šaćirbegović and Zvornička. Three roundabouts will be built at this section, together with one underpass for pedestrians. The project costs seven million EUR and the funds were provided by EBRD loan.

Directorate for Roads of the KS and the Municipality of Novo Sarajevo have also launched construction of a roundabout in the settlement Square of Heroes, at the intersection of the streets Porodice Ribar and Aleja lipa. Namely, due to the construction of the south longitudinal, the citizens will not be able to use the parking space behind the Loris building and that is why a roundabout will be built at the Aquare of Heroes. The Municipality of Novo Sarajevo stated that the works should last for more than a month. Within this project, a new connection to the parking space will also be made and the construction of a roundabout at the intersection will significantly unburden the traffic and enable increased flow of vehicles through the intersection. This investment is worth 290.000 BAM.

(Source: akta.ba)

Improving Public Finance Statistics for Greater Transparency in Line with International Standards
Current Projects of the City of Sarajevo: White Fortress to be renovated
GDP in FBiH increased by 3.4 percent in the third Quarter
Measuring the actual Level of Corruption is a Big Challenge in BiH
‘Standard and Poor’s’ Confirmed ‘B’ Rating for B&H
TAGGED:#construction#roads#sarajevoSouthlongitudinal
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article All set for the Construction of the Speed Road Lašva-Nević Polje
Next Article What has been decided on the Meeting between Covic and Radoncic?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

The Ilidza Fire Department received a valuable Donation from Slovenia
June 20, 2026
EU Delegation after the FATF Decision: Eliminating Shortcomings is crucial for BiH’s European Path
June 20, 2026
Penava Shifts the Tone: We Don’t Want “Herzeg-Bosnia,” and We Aren’t Bringing BiH into Question
June 20, 2026
The Only Image of Death in the Yugoslav War: EFJ Seeks To Strip Bojan Stojanović of an Award
June 20, 2026
The Dragons Could Face Germany in Knockout Stage, But Only in Theory: Here Is Who Barbarez’s Side Could Actually Draw
June 20, 2026
The Tenth Jubilee Edition of the Vucko Trail, the largest Trail Race in BiH
June 20, 2026
Great Anniversaries of Svrzo’s House and a unique Setting for Damir Imamovic’s Sevdah
June 20, 2026
Work on Corridor Vc Slowed Down: FBiH Government Extends Toll Suspension
June 20, 2026
Edin Dzeko is an Idol for the young Players
June 20, 2026
Food Safety Agency of BiH: Condition Good, but Risk Must Be Reduced to a Minimum
June 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?