By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: New Combined Heat and Power Plant Toplana Zenica expected to start Operation in 2021
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > New Combined Heat and Power Plant Toplana Zenica expected to start Operation in 2021
BUSINESS

New Combined Heat and Power Plant Toplana Zenica expected to start Operation in 2021

Published: March 13, 2020
Share
SHARE

 

New combined heat and power (CHP) plant Toplana Zenica, expected to start operation in 2021, will eliminate the use of coal for district heating and utilize waste gases from the ArcelorMittal Zenica steel plant, it was said during the official start of the construction works in the town in central Bosnia and Herzegovina, according to Balkan Green Energy News.

The CHP plant will have a power output of 14.45 MW and a heat capacity of 112.5 MW.

ArcelorMittal Zenica CEO Nikhil Mehta said the construction works are expected to be finished by the end of 2020.

New CHP facility will not use coal, which translates to the complete elimination of SO2 emissions It means the new CHP facility will not use coal in its boilers, which translates to the complete elimination of SO2 emissions and a more stable supply of heat to consumers, he said.

According to an earlier statement by BiH’s Federal Environment and Tourism Minister Edita Đapo, the EUR 53 million project will reduce SO2 emissions by 70% from current levels.

The CHP plant is being built by joint venture Toplana Zenica, established by ArcelorMittal Zenica (50%), the City of Zenica (20%), Finland’s clean energy solutions provider KPA Unicon (15%), and Finnfund, a Finnish development financier (15%).

The financing agreement for the facility was signed in March last year. The EUR 46 million package was secured by the European Bank for Reconstruction and Development (EBRD).

Zenica Mayor Fuad Kasumović said it is very important the city didn’t have to take a loan for this investment.

The city secured only BAM 4.7 million (EUR 2.4 million) as a founding stake in the business, he said.

Written by Vladimir Spasic for Balkan Green Energy News

BiH’s Defense Minister met with the Association of Military Accreditors
BiH’s Presidency members to meet with Hahn and Mogherini
What will the Facility Veneto Otoka look like? (Gallery)
EUFOR conducted Training with BiH’s Armed Forces who are preparing for their Deployment to Afghanistan
Positive Story: Winter Clothes and Blankets for Migrants Children provided
TAGGED:#BiH#operation#power#Zenicaheat
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article NATO Secretary General meets the Foreign and Defense Ministers of Bosnia and Herzegovina
Next Article Exports from Italy to Bosnia and Herzegovina in the first Two Months decreased by 8 Million Euros
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Bosnia and Herzegovina Marks 34 Years of United Nations Membership
May 22, 2026
Magyar assures Becirovic: Hungary seeks Relations founded on Respect
May 22, 2026
Radoncic: SBB will return, we are running for a Member of the BiH Presidency
May 22, 2026
BiH FM to participate at GLOBSEC Forum 2026
May 22, 2026
Duran sentenced to 43 Years in Prison for the Murder of Nadira Sahacic
May 22, 2026
Intensifying Cooperation between the judiciary of BiH and Croatia
May 22, 2026
Former Workers of the Zenica Brown Coal Mine threaten Hunger Strike
May 22, 2026
Anniversary of the Death of Twelve Babies over Lack of Oxygen in Banja Luka
May 22, 2026
BiH FM Files a Criminal Complaint Regarding the Opening of the Border Crossing in Bosanska Gradiška
May 22, 2026
Belgium launches Investigation into ‘Sniper Safaris’ during Bosnian War
May 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?