By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: New Combined Heat and Power Plant Toplana Zenica expected to start Operation in 2021
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > New Combined Heat and Power Plant Toplana Zenica expected to start Operation in 2021
BUSINESS

New Combined Heat and Power Plant Toplana Zenica expected to start Operation in 2021

Published: March 13, 2020
Share
SHARE

 

New combined heat and power (CHP) plant Toplana Zenica, expected to start operation in 2021, will eliminate the use of coal for district heating and utilize waste gases from the ArcelorMittal Zenica steel plant, it was said during the official start of the construction works in the town in central Bosnia and Herzegovina, according to Balkan Green Energy News.

The CHP plant will have a power output of 14.45 MW and a heat capacity of 112.5 MW.

ArcelorMittal Zenica CEO Nikhil Mehta said the construction works are expected to be finished by the end of 2020.

New CHP facility will not use coal, which translates to the complete elimination of SO2 emissions It means the new CHP facility will not use coal in its boilers, which translates to the complete elimination of SO2 emissions and a more stable supply of heat to consumers, he said.

According to an earlier statement by BiH’s Federal Environment and Tourism Minister Edita Đapo, the EUR 53 million project will reduce SO2 emissions by 70% from current levels.

The CHP plant is being built by joint venture Toplana Zenica, established by ArcelorMittal Zenica (50%), the City of Zenica (20%), Finland’s clean energy solutions provider KPA Unicon (15%), and Finnfund, a Finnish development financier (15%).

The financing agreement for the facility was signed in March last year. The EUR 46 million package was secured by the European Bank for Reconstruction and Development (EBRD).

Zenica Mayor Fuad Kasumović said it is very important the city didn’t have to take a loan for this investment.

The city secured only BAM 4.7 million (EUR 2.4 million) as a founding stake in the business, he said.

Written by Vladimir Spasic for Balkan Green Energy News

Nusret Selimovic appointed as Police Commissioner of the Sarajevo Canton
Dodik in Belgrade: Republika Srpska must decide on its Status and Independence
Appeal Hearing in the Case of Ratko Mladic to be held on Tuesday
Hamdija Lipovaca acquitted of Charges of Embezzlement of almost One Million BAM from the Budget
What is the Value of Weapons produced by BH Companies?
TAGGED:#BiH#operation#power#Zenicaheat
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article NATO Secretary General meets the Foreign and Defense Ministers of Bosnia and Herzegovina
Next Article Exports from Italy to Bosnia and Herzegovina in the first Two Months decreased by 8 Million Euros
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Edin Dzeko’s Giant Jersey Unveiled Over Sarajevo’s Eternal Fire as the “Dijamant” Receives the Farewell He Deserved
October 2, 2026
“11 in Half” in Honor of Edin Dzeko: Instead of the traditional Ten, Eleven Cevapi will be served Today
October 2, 2026
CRA: Election Silence in BiH begins on October 3
October 1, 2026
Dragons completed the last Training Session before the Match with Sweden
October 1, 2026
Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
October 1, 2026
Dodik after Moscow: I proposed an advisory body for Republika Srpska and Russia
October 1, 2026
Debt of the Federation of increased by 1.57 billion BAM
October 1, 2026
COM EUFOR Continues Engagement with Local Authorities in Jajce
October 1, 2026
The Corridor Vc Saga – From Nothing to Nowhere
October 1, 2026
“11 in Half” in Honor of Edin Dzeko: Instead of the traditional Ten, Eleven Cevapi will be served
October 1, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?