By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM
BUSINESS

Sarajevo 12 Transformer Station Opened, a Project Worth 10.5 Million BAM

Published: October 1, 2026
Share
SHARE

The Federal Prime Minister and a member of the Shareholders’ Assembly of Elektroprenos Bosnia and Herzegovina, Nermin Nikšić, along with representatives of the company, officially opened the Sarajevo 12 transformer station today by cutting the ribbon, an investment worth 10.5 million BAM. The new power facility, which was largely constructed through the engagement of domestic companies, represents one of the most significant infrastructure projects for strengthening and modernizing the power grid in Sarajevo.

Nikšić emphasized that the construction of that facility is the result of mutual work and support for projects that contribute to the development of Bosnia and Herzegovina’s power system.

“I am pleased that we were able to contribute to the adoption of financial plans and the initiation of such projects. It is obvious that it is about a very important and necessary facility,” Nikšić emphasized.

He emphasized that it makes him especially happy that the largest part of the investment was realized through the engagement of domestic companies, confirming that Bosnia and Herzegovina possesses the expert personnel and capacity to execute complex infrastructure projects.

He added that the new substation will bring greater security to the Sarajevo citizens and stability in electricity supply, while also opening up opportunities for new business and investment projects in the area.

General Manager of Elektroprenos Bosnia and Herzegovina, Miro Džakula, said that the need to build the Sarajevo 12 transformer station arose from continuous development and growing electricity consumption in the Novo Sarajevo area.

Džakula recalled that this area was previously supplied from several neighboring substations, which limited network development opportunities and the connection of new users.

“Through the planning and realization of this project, a temporary solution has been replaced by a permanent and contemporary power facility. This is one of the most significant projects for strengthening and modernizing the power infrastructure in the Sarajevo region,” Džakula emphasized.

The new substation is connected to the existing 110 kV network via the Sarajevo 7 and Sarajevo 13 substations and is equipped with the most contemporary protection, management, and monitoring systems.

Two power transformers with a capacity of 40 MVA each have been installed in the facility, which ensures sufficient capacity for current needs, as well as the future development of that part of the city.

The Federal Minister of Energy, Mining, and Industry Vedran Lakić assessed that his project represents a significant contribution to a safer electricity supply and the further strengthening of Bosnia and Herzegovina’s power system.

“Sincere congratulations to the management of Elektroprenos led by Director Džakula, as well as to all members of the Management Board of Elektroprenos, and of course to shareholders, the prime ministers of both entities in Bosnia and Herzegovina,” Lakić added.

Member of the Management Board of Elektroprenos Bosnia and Herzegovina, Haris Krvavac said that the opening of the Sarajevo 12 transformer station represents an investment in the security, economy, and the future of Sarajevo, and announced the continuation of the investment cycle and new development projects by the company.

With the opening of TS Sarajevo 12, Sarajevo has gained a modern power facility that will significantly improve the security and reliability of electricity supply, relieve the existing network, and enable higher-quality development of the urban area of Novo Sarajevo and Grbavica.

Among others, the official opening of the Sarajevo 12 transformer station was attended by the Prime Minister of Sarajevo Canton, Nihad Uk, Mayor of Novo Sarajevo Municipality, Benjamina Karić, representatives of the State Electricity Regulatory Commission, Elektroprivreda BiH, members of the Management Board of Elektroprenos BiH, contractors, and business partners.

 

On the Doorstep of a New Debt?
Roaming between Countries of the Western Balkans to be completely abolished soon
New Corridor 5c Subsection in Operation from Today
IMF Postpones Consideration of the Extension of Stand-By Arrangement
Days of Architecture 2017 to start in Sarajevo on Wednesday
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Dodik after Moscow: I proposed an advisory body for Republika Srpska and Russia
Next Article Dragons completed the last Training Session before the Match with Sweden
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Bosniak Organizations from the U.S. seek Visa Restrictions for Dodik
November 10, 2026
Dragons held a Training Session in Butmir
November 10, 2026
SDA announces the Takeover of Power in Sarajevo
November 10, 2026
Delegations Pay Tribute to Victims at Kazani: The Crime must have a Name, and the Victims Dignity”
November 10, 2026
Mayor of Sokolac Meets COM EUFOR at Camp Butmir
November 9, 2026
Acting High Representative Crishock at Kazani: “We owe them lasting remembrance”
November 9, 2026
Employers call for a Reduction in electricity Prices and other Business Pressures
November 9, 2026
33rd Anniversary of the destruction of the Old Bridge marked by a Jump without Applause
November 9, 2026
Minic assumed the Mandate of the President of the RS
November 9, 2026
Excellent Performance by a Bosnian Skater at International Competition in Zagreb
November 9, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?