By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Take a look at the future Road Section Tarcin – Ivan Sedlo (VIDEO)
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Take a look at the future Road Section Tarcin – Ivan Sedlo (VIDEO)
OTHER NEWS

Take a look at the future Road Section Tarcin – Ivan Sedlo (VIDEO)

Published: June 6, 2018
Share
SHARE

The length of the section of the highway at Corridor 5C from Tarcin to Ivan Sedlo, including the tunnel Ivan, should be about seven kilometers. This section will be continued on the previously constructed part of the highway from Zenica to Tarcin.

This section should include two bridges as well, and their length will be around 520 meters and 610 meters.

Connection to the existing M-17 highway will be constructed at the exit, i.e. the southern side of the tunnel Ivan. The tunnel itself will be constructed in the same place as the existing one on the highway, but it will be around 50 meters below the existing one.

The section will be shortened from several kilometers to several hundred meters from the exit of the tunnel to the connection with the main road.

The estimated cost of the construction of this section, including the tunnel Ivan, amounts to a total of 100 million EUR. Of this amount, 23.8 million EUR of grant funds was secured at the Investment Conference for the Western Balkans, which was held in Sofia. Of this amount, for the construction of the section  will be used a total of 12 million EUR and the remaining 11.8 million EUR will  be used for the construction of the tunnel.

The European Bank for Reconstruction and Development (EBRD) promised to allocate part of the money necessary for the construction of this section and tunnels, while the European Investment Bank (EIB) promised to provide the rest of the money. The condition for signing the contract with the EIB is signing of the contract with the EBRD first.

Take a look at the video:

(Source: akta.ba)

Muslims celebrating the Sacred Night Lailat al Miraj
Sweden, Bosnia work against Money Laundering and Human Trafficking​
An Air Glider crashed near Bihac
Thick Fog slows the Traffic down, Visibility less than 20 Meters at certain Sections
NATO ‘Dynamic Response’ Exercise started in BiH
TAGGED:#construction#corridor5C#EBRD#EIB#infrastructure#roadfuture lookgrant fundssection Tarcin-Ivan Sedlo
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Martina Mlinarevic promoted her Book “Huzur” just Two Days before her Third Surgery
Next Article Electric-powered Boats to sail on Miljacka River in few Years?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

BiH records Increase in Tourist Arrivals
October 6, 2026
Bisera Alikadic, prominent Bosnian-Herzegovinian Writer and Poet, passes away
October 6, 2026
Names to Mark the New Convocation of the House of Representatives of the PSBiH
October 6, 2026
Election Day Passed Successfully, New Technologies Strengthened Integrity, but Irregularities Still Exist
October 6, 2026
Dzeko’s No. 11 Will Not Be Retired in the Bosnia and Herzegovina National Team
October 6, 2026
Barbarez: Everyone was fantastic, gave even more than what we expected
October 6, 2026
Voter Turnout in BiH is below 50 Percent for the first Time: Why do Citizens trust Elections less and less?
October 6, 2026
BiH defeated Poland, Dragons are still undefeated in the League of Nations
October 6, 2026
56 New Police Officers take Oath at FMoI Police Academy
October 5, 2026
SNSD achieved a Convincing Victory, the Opposition recorded a Worse Result than expected
October 5, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?