By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Take a look at the future Road Section Tarcin – Ivan Sedlo (VIDEO)
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Take a look at the future Road Section Tarcin – Ivan Sedlo (VIDEO)
OTHER NEWS

Take a look at the future Road Section Tarcin – Ivan Sedlo (VIDEO)

Published: June 6, 2018
Share
SHARE

The length of the section of the highway at Corridor 5C from Tarcin to Ivan Sedlo, including the tunnel Ivan, should be about seven kilometers. This section will be continued on the previously constructed part of the highway from Zenica to Tarcin.

This section should include two bridges as well, and their length will be around 520 meters and 610 meters.

Connection to the existing M-17 highway will be constructed at the exit, i.e. the southern side of the tunnel Ivan. The tunnel itself will be constructed in the same place as the existing one on the highway, but it will be around 50 meters below the existing one.

The section will be shortened from several kilometers to several hundred meters from the exit of the tunnel to the connection with the main road.

The estimated cost of the construction of this section, including the tunnel Ivan, amounts to a total of 100 million EUR. Of this amount, 23.8 million EUR of grant funds was secured at the Investment Conference for the Western Balkans, which was held in Sofia. Of this amount, for the construction of the section  will be used a total of 12 million EUR and the remaining 11.8 million EUR will  be used for the construction of the tunnel.

The European Bank for Reconstruction and Development (EBRD) promised to allocate part of the money necessary for the construction of this section and tunnels, while the European Investment Bank (EIB) promised to provide the rest of the money. The condition for signing the contract with the EIB is signing of the contract with the EBRD first.

Take a look at the video:

(Source: akta.ba)

“Caravan of Friendship“ started a Journey from Mostar to Vukovar
50 million BAM to be allocated for new Employment Measures in FBiH
The Miners are losing Hope of finding a Colleague in the Mramor Mine
Thousands of People at the Funeral for Miners: This is not a good-bye, we’ll meet again
Labyrinth of BH Administration: Tax for Fallout Shelter
TAGGED:#construction#corridor5C#EBRD#EIB#infrastructure#roadfuture lookgrant fundssection Tarcin-Ivan Sedlo
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Martina Mlinarevic promoted her Book “Huzur” just Two Days before her Third Surgery
Next Article Electric-powered Boats to sail on Miljacka River in few Years?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Another Victim Dies Following EUFOR Helicopter Crash Near Brcko
October 29, 2026
Three killed and Twelve injured in the EUFOR Helicopter Crash in BiH
October 29, 2026
Vehicles worth 480,000 BAM seized in Kotor Varos
October 29, 2026
Dubioza Kolektiv Announces a Large Concert in Sarajevo
October 29, 2026
Istanbul named the world’s third-best city, and its airport the best
October 29, 2026
International Professional Seminar on Protection and Rescue held in BiH
October 29, 2026
Border Crossing Stara Gradiska will be open for Traffic Tomorrow
October 29, 2026
Beautiful Story from Tuzla: Hairdresser Erna Visits the Retirement Home Every Week to Give Free Haircuts
October 29, 2026
Minka Kreho is the new President of the Court of Bosnia and Herzegovina
October 29, 2026
Significant Growth at Tuzla Airport: Passenger Numbers Up with Revenues Reaching 7.91 Million BAM
October 29, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?