By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The construction of A Transversal from the Airport officially started
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The construction of A Transversal from the Airport officially started
OTHER NEWS

The construction of A Transversal from the Airport officially started

Published: September 6, 2015
Share
SHARE

A Transversal Sarajevo akta.ba The Mayor of the Municipality Novi Grad Sarajevo Semir Efendic, the director of the Directorate for roads of the Sarajevo Canton Adem Zolj, the Prime Minister of the Sarajevo Canton Elmedin Konakovic and the Cantonal Minister of Transportation Mujo Fiso today on Dobrinja officially marked the beginning of the construction of the A transversal, which should connect the Sarajevo International Airport with the neighborhood Mojmilo, actually the city of Sarajevo, in a faster way.

As it was said, the new modern road will connect the streets XII transversal, actually the Kurta Schorka street, across the part of the Brace Mulica street with the X transversal, and the total length of this road will amount to 1.800 meters.

The total value of the project is 5.8 million BAM, of which the Municipality Novi Grad Sarajevo together with the Directorate for roads of the Sarajevo Canton already provided a million BAM, and the company Euro-Asfalt Ltd. Sarajevo was selected as a contractor.

The Mayor of the Municipality Novi Grad Sarajevo Semir Efendic explained that this is a modern avenue, which is to have two lanes in both directions, each 35 meters wide, with green dividing lane, wide pavements, and a bicycle track.

A Transversal Sarajevo klix.ba“This is the first transversal being built after the war, and until now we have mostly widened and reconstructed the existing transversals. When it comes to property and legal relations, we have some problems which are more of formal nature, given that the expropriation of the land was conducted during 1970s and some cases exist where it was completed, but the Institute for Construction of the Sarajevo Canton did not register it. That will be solved soon as well”, Efendic said.

(Source: akta.ba)

EUFOR signed MoU with Zenica Cantonal Hospital
BiH Hydrometeorological Institute warns on the Impaired Air Quality until March
Join the Campaign and make Children from socially endangered Families happy
BiH holds National Mourning Day for two Policemen
Citizens of St. Louis: Syrians, come here and be successful as Bosnians!
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article The BH Police Officers departed to the South Sudan
Next Article Analysis of the Milky Way to the EU: The blackmailing Export-Import
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Excellent Results of the Sarajevo Swimming Club
September 27, 2026
Covic: “If the Outvoting of Croats Is Repeated, the Institutions of BiH Could Be Blocked”
September 27, 2026
Direct Foreign Investments in BiH in Decline over political Instability and lack of Labor Force
September 27, 2026
Romania Head Coach Gheorghe Hagi Ahead of the Match in Bucharest: We Will Do Everything to Beat BiH
September 27, 2026
Record-Breaking “Race for the Cure” in Sarajevo
September 27, 2026
Commemoration of the 34th Anniversary of the Suffering of Bosniaks in the Susica Camp
September 26, 2026
Dragons hold a Training Session in Warsaw ahead the Trip to Bucharest
September 26, 2026
Everything You Need to Know Before the Elections: CEC Publishes Detailed Lists and Instructions for Citizens
September 26, 2026
Bosnian Diaspora Files Complaints Against Swiss Magazine Weltwoche Reporting on War Criminal Mladic
September 26, 2026
UDIK remembers the Anniversary of the Closing of the Susica Camp near Vlasenica
September 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?