By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Pocitelj Bridge has been repaired, the opening Date is not yet known
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Pocitelj Bridge has been repaired, the opening Date is not yet known
BUSINESS

The Pocitelj Bridge has been repaired, the opening Date is not yet known

Published April 22, 2024
Share
SHARE

The Pocitelj Bridge has been repaired, but the exact date of reopening to traffic is still unknown. According to the Public Company Motorways of the Federation of Bosnia and Herzegovina (FBiH), the longest bridge of the Vc corridor should be opened by the beginning of the summer season.

Motorways of FBiH remind that during the execution of works on prestressing, damage (appearance of cracks) occurred on the lower plate of segment 15, between the pillars S3 and S4 of the Pocitelj bridge.

In technical terms, according to performed analyses, it was shown that minor changes in the geometry of the cables can lead to significant increases in tensile stress in the concrete. Irregularities in the positioning of cable pipes during construction created radial torsional forces that could lead to problems or the appearance of cracks of a local nature.

After the work to eliminate deficiencies, the bridge was restored to its designed condition, meaning it has the same load-bearing capacity, usability, and durability as envisaged by the main project, Motorways of FBiH added.

The plan is to open the Pocitelj – Zvirovici section, which includes the aforementioned Pocitelj bridge, to traffic by the beginning of the summer season, after which BiH will gain an additional 11 kilometers of motorway on the Vc corridor.

Regarding the continuation of the construction of the Vc corridor in its southern part, the plan is for construction works to start by the end of this year on the Mostar South – Kvanj Tunnel and Kvanj Tunnel – Buna sections.

In addition to these sections, construction works will also commence this year on the Mostar North – Mostar South section in Herzegovina, as well as the construction of the most complex structure on the entire corridor, the Prenj Tunnel.

The start of works on these sections will bring about 40 km of active construction sites, Motorways of FBiH announced.

E.Dz.

Learning from Belgium: improving employment coordination in Bosnia and Herzegovina

Parts for Electric Cars to be produced in BiH?

Young Bosnians developed Software for overcoming Fear and Phobias with the Help of Virtual Reality

Why the Fiscal Council refused a Meeting with the IMF and what are the Consequences?

BiH Companies invited to return to Libya?

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article A Man from a Village in BiH befriended a Bear
Next Article Vucic at the UN: Pristina creates unbearable conditions for the life of Serbs
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Anes Bostandzic Reaches Premier League Final in China
April 11, 2026
Petrol Stations in BiH recorded a further Increase in Prices
April 11, 2026
Traditional Easter Egg Decorating Event held in Banja Luka
April 11, 2026
Balkan Divide Deepens: 2026 Unemployment Map Highlights Alarming Gap for BiH
April 11, 2026
Seriously wounded Mojtaba Khamenei leads Iran out of Isolation as Doubts grow about his Power
April 11, 2026
Slovenian Contingent Change of Command at Camp Butmir
April 11, 2026
Members of the Women of Srebrenica Association held a peaceful Protest in Tuzla
April 11, 2026
Easter Greetings from the Members of the Presidency
April 11, 2026
Strasbourg Court Rejects Dodik’s Bid to Suspend Verdict on RS Presidency
April 11, 2026
Instead of the European Union – BiH is getting closer to the Moneyval Grey List
April 11, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?