By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: B&H Companies ready for the announced Construction of Thermal Power Stations
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > B&H Companies ready for the announced Construction of Thermal Power Stations
BUSINESS

B&H Companies ready for the announced Construction of Thermal Power Stations

Published: June 11, 2015
Share
SHARE

energyEnergoinvest Group gathers a dozen respectable BH companies, which, besides engineering, are engaged in the field of electrical equipment, information systems as well as logistics managing of technological processes in the field of power engineering. Currently, they are preparing for performance at upcoming construction projects of thermal power stations in B&H.

This year, as in the previous ones, they will present themselves at the Energa fair in Tuzla, in order to present the potential of domestic companies in this sector.

Sead Gušmirović, representative of the company Energoinvest d.d. Sarajevo, which is member of this group, says that the group is currently gathering the most respectable companies from the energy sector.

” We are all preparing in a certain way for the construction of the thermal power project in B&H, as well as for the construction of Block 7 in TPP Tuzla and the construction of Unit 1 in TPP Banovići “, said Gušmirović.

He believes that this is the last chance for the construction of thermal power plants in the region.

”The last directives from the meeting of the G7 refer to extinguishing furnaces on carbon fuels, and we as a country of coal are getting more than 70 % of the energy. Our potentials of renewable energy sources do exist, but they will have to be developed and improved in near future. I’m primarily referring to the potentials of hydropower and wind energy. We need to have more interest in the development of the energy sector, when it comes to these areas ” he said.

For all these reasons, the already started activities regarding the construction of new thermal power plants in B&H, should be ended soon.

”Most certainly we will need to adapt to new conditions of exploitation in the following 15-20 years ” he said.

New thermal power units will have to be in accordance with the conditions defined by the European Energy Community Treaty. He emphasized that emissions of harmful gases will have to be within the framework of the allowed parameters.

Energoinvest strives to participate in all important projects that are taking place in B&H. One of the current projects is the construction of substations and transmission power systems, which is funded by the Elektroprenos B&H.

Gušmirović said that each one of the Group’s companies has its both domestic and foreign arrangements. Energoinvest d.d. dominates by the number of affairs that are taking place in the international market, since almost 90% of their projects are implemented abroad.

Countries like Algeria, Libya, North Iraq, Ethiopia, Albania, Montenegro and Serbia are current markets for this company. With their construction sites in Algeria, Albania, Montenegro and Ethiopia they succeeded to provide a solid employment for their staff in this and partially in the next year.

 

(Source: ekapija.ba)

The largest Inflow of Investments to Bosnia and Herzegovina were from Russia
Residents of Bosnia-Herzegovina empty Shelves in Supermarket because of Fear of Coronavirus
Great interest of the Businessmen in the Furniture by MS&WOOD
Council of Ministers decides: 1.8 Billion BAM for Development Projects
Bosnia gets New Kilometers of Highway worth 225 Million Euros
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Statement by Commissioner Johannes Hahn on the Reform Agenda
Next Article Quality of Domestic Bimal Oil Confirmed Once Again
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Will Starlink Launch Operations in Bosnia and Herzegovina Soon
September 25, 2026
BiH Foreign Minister meets with His Latvian Counterpart
September 25, 2026
Proposed One-month Detention for those arrested in the Panther Operation
September 25, 2026
Latvian Delegation Visits EUFOR Headquarters at Camp Butmir
September 25, 2026
Barbarez: We respect the Opponent, but we want to use the Chances we get
September 25, 2026
Fuel Prices hit Record 3.99 BAM per Liter in Bosnia and Herzegovina
September 25, 2026
COM EUFOR Continues Engagement with Local Authorities in Konjic and Visoko
September 24, 2026
The first-instance Verdict against the Former Director of BiH Intelligence Agency scheduled
September 24, 2026
POSKOK files Indictment against former Director of FBiH Motorways
September 24, 2026
Energy Transition: Power Utility of BiH and the Universal Energetics Sign Memorandum of Understanding
September 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?