By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: B&H Companies ready for the announced Construction of Thermal Power Stations
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > B&H Companies ready for the announced Construction of Thermal Power Stations
BUSINESS

B&H Companies ready for the announced Construction of Thermal Power Stations

Published June 11, 2015
Share
SHARE

energyEnergoinvest Group gathers a dozen respectable BH companies, which, besides engineering, are engaged in the field of electrical equipment, information systems as well as logistics managing of technological processes in the field of power engineering. Currently, they are preparing for performance at upcoming construction projects of thermal power stations in B&H.

This year, as in the previous ones, they will present themselves at the Energa fair in Tuzla, in order to present the potential of domestic companies in this sector.

Sead Gušmirović, representative of the company Energoinvest d.d. Sarajevo, which is member of this group, says that the group is currently gathering the most respectable companies from the energy sector.

” We are all preparing in a certain way for the construction of the thermal power project in B&H, as well as for the construction of Block 7 in TPP Tuzla and the construction of Unit 1 in TPP Banovići “, said Gušmirović.

He believes that this is the last chance for the construction of thermal power plants in the region.

”The last directives from the meeting of the G7 refer to extinguishing furnaces on carbon fuels, and we as a country of coal are getting more than 70 % of the energy. Our potentials of renewable energy sources do exist, but they will have to be developed and improved in near future. I’m primarily referring to the potentials of hydropower and wind energy. We need to have more interest in the development of the energy sector, when it comes to these areas ” he said.

For all these reasons, the already started activities regarding the construction of new thermal power plants in B&H, should be ended soon.

”Most certainly we will need to adapt to new conditions of exploitation in the following 15-20 years ” he said.

New thermal power units will have to be in accordance with the conditions defined by the European Energy Community Treaty. He emphasized that emissions of harmful gases will have to be within the framework of the allowed parameters.

Energoinvest strives to participate in all important projects that are taking place in B&H. One of the current projects is the construction of substations and transmission power systems, which is funded by the Elektroprenos B&H.

Gušmirović said that each one of the Group’s companies has its both domestic and foreign arrangements. Energoinvest d.d. dominates by the number of affairs that are taking place in the international market, since almost 90% of their projects are implemented abroad.

Countries like Algeria, Libya, North Iraq, Ethiopia, Albania, Montenegro and Serbia are current markets for this company. With their construction sites in Algeria, Albania, Montenegro and Ethiopia they succeeded to provide a solid employment for their staff in this and partially in the next year.

 

(Source: ekapija.ba)

Revenues from Excise Taxes on domestic Tobacco in BiH reduced 100 Times

Agricultural Sector made significant Changes compared to the previous Year

A Project Partner was selected for the Construction of Block 7 in Tuzla

The Indonesian Embassy in Sarajevo participates in Halal Expo and Real Expo Sarajevo 2025

Sokolac Takes Loan of Three Million KM To Build Ethno Villages

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Statement by Commissioner Johannes Hahn on the Reform Agenda
Next Article Quality of Domestic Bimal Oil Confirmed Once Again
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Trump announces End to War with Iran: ‘We have an incredible Two days ahead’
April 15, 2026
A new Law on the Southern Gas Interconnection has been adopted in the Federation of BiH
April 15, 2026
Interfaith Delegation from the Midlands prepares for a Visit to BiH
April 15, 2026
Cooperation between BiH and NATO in Focus of Meeting in Brcko
April 15, 2026
Bosnian Photographer Finds Items and Bones Believed to Belong to National Hero Ilija Spanovic
April 15, 2026
A Spectacle Expected at Kosevo Stadium: 30,000 Fans Set to Attend BiH vs North Macedonia Match
April 15, 2026
War Criminal Ratko Mladic Suffers Stroke While Serving Life Sentence
April 15, 2026
HR Schmidt says European Integration must urgently move beyond the Deadlock
April 15, 2026
EUFOR Forces Step Forward: Blood Donation Drive Supports Local Communities
April 15, 2026
Red Bull 400 Race Applications Open: Are You Ready for the Toughest 400 Meters of Your Life?
April 15, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?