By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: BiH to Build Largest Solar Power Plant in €100 Million Investment
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > BiH to Build Largest Solar Power Plant in €100 Million Investment
BUSINESS

BiH to Build Largest Solar Power Plant in €100 Million Investment

Published: May 22, 2025
Share
SHARE

In the area of Komanje Brdo near Stolac, construction has begun on the largest solar power plant in Bosnia and Herzegovina (BiH). The project, worth around 100 million euros, is expected to be completed in 12 months, and local authorities estimate that the city will generate revenue between three and four million BAM through concessions and utility fees, depending on the amount of electricity produced.

Production of 200 million kilowatt-hours annually

The power plant is expected to produce 200 million kilowatt-hours annually, over a period of 30 years, and to contribute to the energy transition and development of renewable energy sources in BiH.

The company Aurora Solar d.o.o., registered in BiH, is listed as the project investor, while the contractor is the Chinese company NORINCO International. Behind the seemingly local solar power plant project are deeper roots of capital. According to official data from the BiH business register, the project investor is co-owned by the domestic company Tehnomerkur and the Hungarian company Green Power Investment. But what makes this story particularly interesting is its third, much stronger actor: China.

That it will take over the majority stake in Aurora Solar, Norinco International – formally part of China North Industries Corporation, a Chinese state-owned company also known for its work in the defense and engineering sectors – announced earlier.

How much China invests in BiH

And this is not the first entry of a Chinese company into the energy sector of Southeast Europe. The company is already involved in a series of major infrastructure projects in the region, including the construction of the largest wind power plant in Croatia.

Chinese investments in BiH are present in various sectors. According to data from the Foreign Investment Promotion Agency (FIPA), by 2023 Chinese loans and investments in BiH exceeded three billion dollars.

From 2010 to 2022, BiH took more than 2.44 billion dollars in loans from China for the construction of highways, hydroelectric power plants, investments in gasification and coal production,FIPA stated.

Central Bank of BiH published Financial Stability Risk Assessment Report
Miners did not receive the Salary after the Protest in Sarajevo
Croatia donates Protective Medical Equipment to Bosnia and Herzegovina
Japanese interested in the Energy Sector of B&H?
BBI Bank: Million KM Half-Year’s Profits
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Trump Told European Leaders Putin Has No Intention of Ending the War
Next Article New Protective Tariffs on Imports from Russia and Belarus voted
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Non-working Sundays in the Federation of BiH once again in Question
October 13, 2026
The IMF warns that BiH’s economic Growth is slowing down, Inflation is rising
October 13, 2026
BiH FM Reveals What He Asked of the Saudi Prince over the Issue of Dodik’s Lobbyists
October 13, 2026
CEC Receives Diaspora Votes: Counting Follows, Which Could Change Election Results
October 13, 2026
Deadlines Bind the Federation, Nothing Binds the State: Are Dodik’s Announcements a Threat that 2010 or 2018 Will Repeat for Us?
October 13, 2026
EUFOR Commander Praises Albanian Contribution to Peace and Stability in BiH
October 13, 2026
RiTE Ugljevik facing a new Suspension of Work
October 13, 2026
Who will form the Government in Herzegovina Neretva Canton?
October 13, 2026
BiH FM with the Ambassador of Saudi Arabia: Strong mutual Support for Sovereignty and Territorial Integrity
October 12, 2026
Dodik: We continue to work with the HDZBIH, the Constitution of the BiH Presidency will follow
October 12, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?