By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Businessmen from Tešanj investing in the Construction of Solar Power Plants
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Businessmen from Tešanj investing in the Construction of Solar Power Plants
BUSINESS

Businessmen from Tešanj investing in the Construction of Solar Power Plants

Published: February 20, 2016
Share
SHARE

received_1109094889141466Ministry of Energy, Mining and Industry of FBiH published a notice for public in which are listed nine new requests for issuance of energetic permits for the construction of new and reconstruction of existing production plants, five of which are from Tešanj.
The Economic society HIFA-Benz Ltd. Tešanj submitted a request for extension of energetic permit for the construction of a solar photovoltaic power plant “HB 10-1” with installed nominal power of 10 kW and expected annual production of 10.70 MWh.

Economic society TIK Ltd. Jelah-Tešanj submitted a request for extension of energetic permit for the construction of a solar photovoltaic power plant “TIK 1” with installed nominal power of 127 kW and expected annual production of 153.1 MWh.
The company Inter Ltd. Tešanj submitted a request for extension of energetic permit for the construction of a solar photovoltaic power plant “INTER IN 23-1” with installed nominal power of 20 kW and expected annual production of 24.3 MWh.

The economic society Kalim-Profil Ltd. Tešanj submitted a request for extension of energetic permit for the construction of a solar photovoltaic power plant “Kalim K23-1” with installed nominal power of 22 kW and expected annual production of 24.40 MWh.
Economic society Kalim Ltd. Tešanj also submitted a request for extension of energetic permit for the construction of a solar photovoltaic power plant “Kalim K23-2” with installed nominal power of 22 kW and expected annual production of 24.40 MWh.

All mentioned companies enclosed the necessary documentation in accordance with prescribed procedure and the Ministry of Energy, Mining and Industry accepted their requests as complete.
(Source: akta.ba)

Yield of Olives more than Doubled in BiH in 2018
Who are the richest People in BiH?
Coal Mine “Breza” to get Modern Equipment
Kosarac: Documentation is being carefully prepared for Confrontation with Croatia in the Trgovska Gora Case
Why Bosnia and Herzegovina’s Arms Exports Are Losing Momentum
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article The requested Aid approved for the Employees of Krivaja-Mobel
Next Article Sale of Tickets for the Match Switzerland – BiH began, what is the Price?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

“FUTURE IS THE EU” – Young people in Tuzla discuss the future of Bosnia and Herzegovina
September 28, 2026
Electricity Prices in BiH increased in the First Half of the Year
September 28, 2026
The Trade Union Consumer Basket in Republika Srpska reached 2,937 BAM
September 28, 2026
Sarajevo Canton is recording an Increase in the Number of Tourists
September 28, 2026
Disgraceful Scenes at Marakana: Children Chant for Convicted War Criminal Ratko Mladic
September 28, 2026
RS MoI on Suljagic’s Claims: The Police do not plan to arrest or enter the Memorial Center
September 28, 2026
Starlink will soon start Operating in Bosnia and Herzegovina
September 28, 2026
BHANSA invests 32.46 Million BAM in Five new Radars
September 28, 2026
The Price of Oil rose sharply again: What Consequences will BiH feel?
September 28, 2026
A new Test for the Dragons: BiH Tonight against Romania in Bucharest
September 28, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?