In the area of the municipality of Ilidza, the construction of the last part of the Sarajevo bypass, sub-section, LOT-3B, as an integral part of Corridor 5C, will soon begin.
The construction of this road will enable a better traffic connection of the highway on Corridor 5C with the network of lower-ranking roads, main and local roads.
The value of the contract is 23,283,000 BAM with VAT. Mayor of Ilidza Nermin