By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: ”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > ”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production
BUSINESS

”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production

Published February 25, 2013
Share
SHARE

They hydroelectric system “Elektroprivreda RS” is currently generating production volume by around 27 percent more than was planned for this year’s period.

The Directorate for Production of “Elektroprivreda RS” confirmed that daily production of electricity from hydropower plants these days is more than nine gigawatt-hours, and river flows are abundant. It was said that long-term stability of electrical production couldn’t account for the entire system, but that currently they can guarantee when it comes to the hydroelectric system on Trebišnjica.

“The hydropower on Trebišnjica is an accumulated hydrosystem and there has long been a plan for production on the basis of the current hydropower capability. Given that currently there is a large reservoir of water in Bileća, where elevation is 10 meters above the plan, which is around 200 gigawatt-hours above the plan, it is possible to announce the stable operation of power systems in the future’’, announced the Directorate for Production of “Elektroprivreda RS”.

They said that the flow of hydropower plants in Višegrad and Bočac, on the basis of current flow they cannot provide long-term production because they have reservoirs that provide production for one day (hydroelectric plant Višegrad) to seven days (hydroelectric plant Bočac).

Thermal power plants with a total production of “Elektroprivreda RS) accounts for 60 percent of total production.

In the last few years thermal power plants had a record production level.

Highways of the FBiH recorded Increase in Revenues

Zenica, Travnik, Novi Travnik, Vitez and Busovača to Build a Joint System of Water Supply Worth 40 Million BAM

Cantonal Hospital in Bihac is faced with Numerous Problems

It is still uncertain whether the Fuel Prices will decrease in BiH

Yacht Derubis 44 Fly, fully produced in Bosnia and Herzegovina, presented in Sarajevo

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Exhibition of video works in ”Collegium Artisticum”
Next Article Pjanić – the best player of the match Atalanta and Roma
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Sayonara Sarabon: Sarajevo Factory from the Scent of Chocolate to Ruins
April 18, 2026
“Sarajevo Safari”: 100,000 BAM Reward for Shooting a Child, Casings Considered Trophies
April 18, 2026
What We Know About the Largest Energy Project in Bosnia and Herzegovina
April 18, 2026
Sarajevo International Guitar Festival celebrates its 15th Edition
April 18, 2026
Uncertain Future of the Granit Quarry in Jablanica: Sealing Delayed, Employees Concerned
April 18, 2026
Dodik: Croatia Abuses Border Control Mechanisms and Harasses Citizens
April 18, 2026
FBiH Government Delegation meets US Energy Secretary Wright on Southern Interconnection
April 18, 2026
HJCP President Says He Was Not Informed About Possible Suspension of Funding for External Experts
April 18, 2026
The CBBH Delegation holds a Series of Meetings with Representatives of the World’s Strongest Central Banks
April 18, 2026
Blanusa: “Opposition seeks Election Delay pending new Technologies”
April 18, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?