By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: ”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > ”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production
BUSINESS

”Elektroprivreda RS”: Abundance of Rainfall Significantly Increased Production

Published: February 25, 2013
Share
SHARE

They hydroelectric system “Elektroprivreda RS” is currently generating production volume by around 27 percent more than was planned for this year’s period.

The Directorate for Production of “Elektroprivreda RS” confirmed that daily production of electricity from hydropower plants these days is more than nine gigawatt-hours, and river flows are abundant. It was said that long-term stability of electrical production couldn’t account for the entire system, but that currently they can guarantee when it comes to the hydroelectric system on Trebišnjica.

“The hydropower on Trebišnjica is an accumulated hydrosystem and there has long been a plan for production on the basis of the current hydropower capability. Given that currently there is a large reservoir of water in Bileća, where elevation is 10 meters above the plan, which is around 200 gigawatt-hours above the plan, it is possible to announce the stable operation of power systems in the future’’, announced the Directorate for Production of “Elektroprivreda RS”.

They said that the flow of hydropower plants in Višegrad and Bočac, on the basis of current flow they cannot provide long-term production because they have reservoirs that provide production for one day (hydroelectric plant Višegrad) to seven days (hydroelectric plant Bočac).

Thermal power plants with a total production of “Elektroprivreda RS) accounts for 60 percent of total production.

In the last few years thermal power plants had a record production level.

Decrease of Collected Cow Milk and Slaughtered Cattle in BiH
Fruit and Vegetable Sector recorded a slight Increase in Exports from Bosnia-Herzegovina
Without foreign direct Investments, the BiH Economy would sink deeper
BH Company creates premium Briquettes from Coal Dust
Farm ‘Spreca’ plans investments worth 120 million BAM
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Exhibition of video works in ”Collegium Artisticum”
Next Article Pjanić – the best player of the match Atalanta and Roma
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Mayor Avdic withdraws Draft Decision on the Regulatory Plan Quadrant C-Marijin Dvor
July 27, 2026
Rescuers from GSS Zenica Carry Out Operation to Return Surviving Mountaineers
July 27, 2026
Number of Google Searches to Visit BiH jumped by 5, 800 Percent: Growing Tourist Interest Following the World Cup
July 27, 2026
Orlic: Search on Elbrus suspended due to Stormy Winds
July 27, 2026
Becirovic sent his Condolences on the over the Tragedy on Elbrus Mountain
July 27, 2026
Bosnia’s Ruling Coalition Nears End of Mandate with Few Promises Delivered
July 27, 2026
BiH Exhausts Annual Foreign Worker Quota as Businesses Call for Labor Market Reform
July 27, 2026
Association of Independent Intellectuals Problematizes Design of Ballots for the Presidency of Bosnia and Herzegovina
July 27, 2026
Letter by the London Mayor: “Being in Srebrenica is a deeply moving Experience I will carry with me for the rest of my life”
July 27, 2026
Solomun Wraps Up the Sarajevo Film Festival Once Again: “Sarajevo, I Missed You”
July 27, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?