By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Federation of BiH suspends Issuing of Energy Permits for Small Hydropower Plants
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Federation of BiH suspends Issuing of Energy Permits for Small Hydropower Plants
BUSINESS

Federation of BiH suspends Issuing of Energy Permits for Small Hydropower Plants

Published April 2, 2021
Share
SHARE




The Federation of Bosnia and Herzegovina (FBiH) Government has determined and sent to the FBiH Parliament the Proposal of the Law on Amendments to the Law on Electricity in FBiH, and one of the novelties is the provision that a small hydropower plant (sHPP) is a hydropower facility with installed capacity up to and including 10 MW.

It is also stipulated that the issuance of energy permits for small hydropower plants is suspended. Applicants for the issuance of energy permits who have concluded concession agreements with the competent authority before the entry into force of this Law are exempted from this, provided that they are obliged to complete the application for the issuance of energy permits within three years, the FBiH Government said.

Amendments to the Law were proposed after the FBiH Government instructed the competent federal ministries, two water agencies and the FBiH Concessions Commission to prepare proposals for amendments to all regulations within their competences, in accordance with the conclusion of the House of Representatives of the FBiH Parliament construction of small hydropower plants.

As explained, the capacity of 10 MW of installed capacity is increasingly accepted in Europe as an upper limit and is supported by the European Association of Small Hydropower Plants (ESHA) and the European Commission.

High School students to receive “Max van der Stoel” Award on November 9th

Investors from Pakistan To Arrive in Sarajevo

Dodik: RS Police will prevent the Arrest of Citizens who deny Genocide

A Threat of placing BiH on a Grey List to be removed?

The first significant Achievement in Obtaining a License for Red Meat Export to the EU achieved

TAGGED:#BiH#Federation#government#hydropowerplant
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Trial in ‘Novalic et al.’ Case regarding Purchase of Respirators continues
Next Article Due to the Delay in the Procurement of Vaccines, the Citizens announced Protests
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The Federation of BiH introduces easier Employment of Foreigners
April 21, 2026
CoM establishes the Proposal for Conducting Negotiations on Construction of the Southern Interconnection
April 21, 2026
BiH and Algeria strengthen Economic Ties at First Bosnian-Algerian Economic Day
April 21, 2026
Searches underway in the Federal Police Administration
April 21, 2026
Bradara: BiH has People who know, work and create, Institutions must follow them
April 21, 2026
Delegation from the City of Vienna visited Sarajevo
April 21, 2026
Head of the EU Delegation in BiH: BiH risks losing up to 373.9 Million Euros
April 21, 2026
More efficient Investigations in Agreement between BiH Prosecutor’s Office and FBiH Tax Administration
April 21, 2026
President of HDZ Party: A meaningful Conversation with the SNSD
April 21, 2026
Ban on Integrated Production begins at Zenica Steel Plant
April 21, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?