By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: First Solar Power Plant in B&H exceeding the expected Production
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > First Solar Power Plant in B&H exceeding the expected Production
BUSINESS

First Solar Power Plant in B&H exceeding the expected Production

Published: February 2, 2016
Share
SHARE

Solar Power Plant radioglasdrine.comThere are 16 solar power plants at the territory of FB&H that sell electricity to electro-energetic enterprises. Solar power plants have proven to be an excellent project which can reduce electricity bills if used for personal purposes or which can generate profit if you sell the produced electricity.

The first solar power plant in B&H was opened in March 2012 in Kalesija, built by Sadik Fatić and his son Selmir, owner of the company “Eko Energija”. It is installed on the roof of the City Hall in Kalesija and its construction cost 800,000 BAM. The collected sun energy is being transformed into electrical energy with the help of solar modules and that electricity is then sent to the system of Elektroprivreda BiH. The solar power plant has the power of 12 kilowatts and solar panels cover 1,200 square meters.

“We are satisfied with the work of the solar power plant that generates between 130,000 and 150,000 kilowatt hours annually. So far, we have achieved production by 30 percent higher than expected, thanks to the equipment of highest quality,” Selmir Fatić said.

This solar power plant earns over 110,000 BAM annually. Selmir expects the return of invested money in less than five years, which means that profit will be generated after that, of which one thousand BAM has to be paid for the rental of the roof. Fatić recommends everyone interested in such projects to build a solar power plant because concession is not paid for it.

“This is something new here and a lot can be learned in the field of renewable sources of energy. I advise everyone who has the opportunity to invest in solar, hydro and wind power plants because they are really cost-effective. Such projects demand investments, but the profit is secured and that is the most important,” Fatić said.

(Source: klix.ba)

Energoinvest got a Job worth 13.5 Million EUR
Federation of BiH to put Hundred newly built Solar Power Plants into Operation
Analysis: Inevitable Increase of Prices of Gas in both Entities in BiH
Potential of RS for Development of Green Economies
Municipality Tuzla: Signing of Letter of Intent
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Taxi Driver prevented the Robbery of a Gas Station and Disarmed the Robber! (video)
Next Article There are No Indications that the Migrant Routes could affect B&H
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

“No Room for Impunity”: Austria Opens Probe Into Alleged Sarajevo Sniper Tours
May 21, 2026
Guardians of the City: Sarajevo Police Officers Celebrated for Heroic Actions
May 21, 2026
Minister of Education, Science, Culture and Sports of USC arrested
May 21, 2026
Ginkel: Energy Security is crucial for the Prosperity of BiH
May 21, 2026
The Directorate’s Delegation participates in the INTERPOL European Conference in Toledo
May 21, 2026
BiH Council of Ministers adopts the Budget
May 21, 2026
SDA to Amidzic: No Insults or Threats change the fact that you are parasitizing on a System you “do not recognize”
May 21, 2026
DCOM EUFOR meets with Deputy Chief of Joint Staff of the Armed Forces of BiH
May 21, 2026
Searches are underway at several Locations in Una Sana Canton
May 21, 2026
BiH opens Border Crossing, but also a Path to a new Crisis at the State Level
May 21, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?