By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: German Development Bank to finance the Construction of the WPP Bitovnja with 1.1 million EUR
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > German Development Bank to finance the Construction of the WPP Bitovnja with 1.1 million EUR
BUSINESS

German Development Bank to finance the Construction of the WPP Bitovnja with 1.1 million EUR

Published: August 28, 2018
Share
SHARE

Director General of the Public Company Elektroprivreda BiH Bajazit Jasarevic and Executive Director for Economic Affairs Muhamed Razanica signed the contract worth 1.100.000 EUR for preparation of the project Wind Power Plant “Bitovnja” with representatives of the German Development Bank (KfW) Constanze Kreiss and Matthias Schmidt-Rosen in Sarajevo.

The German Development Bank approved non-refundable funds, which were allocated by the Government of Germany within the framework of development cooperation of Germany with BiH.

PE Elektroprivreda BiH is planning the construction of up to 25 wind turbines of total installed power of 60 MW, depending on the type of turbine.

The minimum annual production of 110 GWh of electricity was estimated by current analysis.

The wind power plant “Bitovnja” is planned for implementation within the Long-term Development Plan of PE Elektroprivreda BiH as one of the crucial production energy facilities based on renewable energy sources.

The location of the planned WPP “Bitovnja” is in the northern part of the Municipality of Konjic, near the border with the neighbouring Municipality of Kresevo, about 30 kilometers from Sarajevo. It is located between 1.530 and 1.700 meters above the sea level.

Within the development cooperation of Germany, KfW will also fund the project of wind power plant “Podvelezje” with 15 wind turbines, which will be constructed around 10 kilometres away of Mostar, as announced by the Service for Communications of EPBiH.

(Source: Sarajevo Times)

Court confirmed Indictment in Case Miljan Aleksic et.al over Tax Evasion
Mladen Ivanic speaks about the possible Lawsuit against Serbia
Relations between Bosnia-Herzegovina and Slovenia are close and friendly
Old Bridge illuminated in Purple Colour in Support of People with Epilepsy
Positive Story: Residents of Sarajevo helped Single Mother of Four
TAGGED:#BiH#funds#GermanyPE Elektroprivreda BiHthe German Development Bank (KfW)wind power plantWPP Bitovnja
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Chinese Investors interested in Cooperation in Tourism and Sports
Next Article Kurz: We must not lose the Western Balkans
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Archbishop Vuksic in Rome: Sincere Interreligious Dialogue heals the Wounds of the Past
November 26, 2026
Everyone Complains, but Nobody Protests: Experts Explain Why Citizens of BiH Don’t Take to the Streets
November 26, 2026
Igor Dodik Announces Wage Increases and Management and Dismissals in RS Public Enterprises
November 26, 2026
Interview with Becirovic: BiH is an indivisible State; the Messages of ZAVNOBiH should serve as a Guiding Light
November 26, 2026
Ryanair granted Slots for new Sarajevo Flights
November 26, 2026
BiH has already lost 212 million BAM from the Growth Plan
November 26, 2026
Dodik after the Decision of the Constitutional Court: They Will Not Put Up a Single Flag of the Army of RBiH in RS
November 26, 2026
BiH on the Statehood Day 2026: Statehood Is Historical Heritage, Peace the Greatest Value, and European Future a Strategic Goal
November 26, 2026
Filipovic with the Italian Ambassador about BiH’s European Path and Bilateral Cooperation
November 26, 2026
A Reminder of the historical Continuity of Bosnia and Herzegovina
November 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?