By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Hydro Power Plants on Drina as most Important Energy Capacity of Republika Srpska Entity
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Hydro Power Plants on Drina as most Important Energy Capacity of Republika Srpska Entity
BUSINESS

Hydro Power Plants on Drina as most Important Energy Capacity of Republika Srpska Entity

Published: October 2, 2019
Share
SHARE

 

 

 

 

Prime Minister of the Republic of Srpska Radovan Višković visited the company “Hydro Power Plants on Drina” in Višegrad municipality and emphasized on this occasion that this company was one of the most important energy capacities of the Republic of Srpska, RS Times reports.

Prime Minister Viškovic emphasized that “Hydro Power Plants on the Drina” has operated positively for many years and contributed to the development of Republic of Srpska.

“I am glad to see that that despite the weather conditions, they are close to execute their business  plan and with favorable precipitation by the end of the year would even exceed this year’s  plan”, Prime Minister Višković said.

The Prime Minister said that the construction of access roads to the “Hydropower plant on Drina” in the length of five kilometers for which BAM 900,000 was allocated, enabled the smooth operation of this company.

Prime Minister Višković recalled that during the floods the roads leading to the company were not operational which had been changed now and that the employees have access to the company even in case of natural disasters while the investment was also important for the citizens living in this area.

Nedeljko Perišić, Director of the ‘Hydroelectric Power Plants on the Drina’ company said he was satisfied with the road works and that reconstruction road would resume next year and added that an alternative section was also made because due to flooding back in 2010 the road had been blocked.

Perisic said that the overhaul of the company’s generator had been performed and that a contractor had been selected to introduce a new control system – SKADA, which would enable the company to maintain its operational capacity and stability.

 

UNESCO requests from BiH to assess the Potential Impact of Hydroelectric Power Project
What was concluded at the Joint Meeting of FM BiH and FM Serbia?
Turkovic on Occasion of September 11: Citizens of BiH know how Challenging the Fight against Terrorism is
The Project Provided Support to the Economy by Hiring 2.927 Persons
Parliamentary Group for the Protection of Heritage: Herzegovina needs to make better Use of its Potential
TAGGED:#BiH#drina#hydropower#plant#river#visegrad
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article World Bank’s Human Capital Index: How is BiH ranked?
Next Article Possible Snow on Mountains in BiH as of Tomorrow
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Romania Reaffirms Support for BiH’s EU Path as Two Countries Mark 30 Years of Diplomatic Relations
November 25, 2026
Happy Statehood Day of Bosnia and Herzegovina!
November 25, 2026
BiH Needs Democratic Constitutional Reform, Not ‘Special Treatment,’ Professor Says
November 24, 2026
EIB Report shows the Impact of its Projects on sustainable Connectivity in the Western Balkans
November 24, 2026
CEC BiH certifies First Candidate Lists for the Election of Delegates to the HoP and the FBiH
November 24, 2026
Students from Bijeljina and Tuzla Discuss the Real Cost of Fast Fashion within EU’s Generation Change Programme
November 24, 2026
Milorad Dodik Congratulates His Son Igor: Igor Is My Pride, My Victory, and a Child of SNSD
November 24, 2026
BiH FM calls for stronger Support for BiH’s European Path at Meeting in Athens
November 24, 2026
New details on Police Operation: suspected Attempt to cover up the Zdrale Case
November 24, 2026
Trump Congratulates BiH Statehood Day: US Looks Forward to Working with Newly Elected Leaders
November 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?