By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Minister Dzindic announces realization of two large energy Projects worth over 150 Million Euros
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Minister Dzindic announces realization of two large energy Projects worth over 150 Million Euros
BUSINESS

Minister Dzindic announces realization of two large energy Projects worth over 150 Million Euros

Published: September 23, 2021
Share
SHARE

Jelovaca wind farm, Tusnica wind farm and Zvizdan solar park will be part of the basic pillar of the Federation of BiH’s energy system in the near future, said FBiH Minister of Energy, Mining and Industry Nermin Dzindic during his visit to Jelovcča wind farm near Tomislavgrad.

“The Jelovaca wind farm was put into operation at the end of 2019. The total value of the investment was 45m euros. Here you can see 18 units of 2 megawatts each, with a total installed capacity of 36 megawatts, and it is a private investor,” said Minister Dzindic in a statement for FENA.

The same investor is working on two new projects: the Tusnica wind farm with a total installed capacity of 72.6 megawatts (project value around 100 million euros) and the Zvizdan solar park with 23 megawatts of installed capacity (project value is around 20 million euros).

The Tusnica wind farm should be in operation by the end of 2023, as well as the Zvizdan solar park.

The total installed capacity in these three projects is about 130 megawatts, and the total value of the investment is over 150 million euros.

David Siljeg broke Record in Length of Flight with Paraglider (video)
Dzaferovic: Serbia’s Participation in Aggression on BiH confirmed
Chief Prosecutor met with Ukrainian​ Ambassador about Icon Case
BiH Foreign Trade Chamber Is Organizing Participation of BiH Companies at GIDA Fair in Istanbul
52.5% of Residents in Republika Srpska Entity consider Banja Luka as the Capital City
TAGGED:#BiH#farm#projects
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Armed Forces of BiH participate in NATO International Exercise in North Macedonia
Next Article BiH Constitutional Court: The State should regulate the Issue of Forest Ownership
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

All Preparations for Commemoration of Srebrenica Genocide are in the Final Phase
June 26, 2026
Organized Crime and Cyber Threats in the Focus of the Conference in Sarajevo
June 26, 2026
Three People injured in a Gas Explosion and Fire in Nova Zeljezara Zenica
June 26, 2026
EUFOR/LEAs/SIPA and AF BiH Conducted Joint Exercise
June 26, 2026
Zeljkovic after a Historical Success: We Made History that Generations Will Remember
June 26, 2026
Conference on modern Security Challenges held in the Parliamentary Assembly of BiH
June 25, 2026
Interview with Commander of NATO HQ Sarajevo Brigadier General James Fowler: Stronger Defense Reforms Key to BiH’s NATO Path
June 25, 2026
EU and Council of Europe launch Project to strengthen the Institutional Capacity of the Constitutional Court of BiH
June 25, 2026
Sarajevo Airport has completely adapted its Infrastructure to People with reduced Mobility
June 25, 2026
A Strong Message from Germany: “Dodik and Trump Administration Pose the Main Threat to BiH”
June 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?