By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Two tunnels Grabosječ on Corridor 5C Piereced
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Two tunnels Grabosječ on Corridor 5C Piereced
OTHER NEWS

Two tunnels Grabosječ on Corridor 5C Piereced

Published: September 18, 2013
Share
SHARE

tunel_vijenacAt the motorway Vlakovo-Tarčin, subsection Lepenica–Suhodoll, the tunnel Grabosječ was pierced, whose right tunnel tube is 830 meters long and 860 meters left.

This means that the total length of both tunnel tubes excavated is about 1.7 kilometers. On the highway corridor 5C this is the second tunnel after tunnel 1. March (Vijenac). The tunnel Grabosječ will be constructed by Turkish company Cengiz Insaat, in partnership with local companies as subcontractors in this subsection. The works on the excavation of the tunnel began in February this year and in a very short period of only seven months there are breached both tunnels.

Tunnel Grabosječ is done according to contemporary Austrian method.

The subsection Lepenica–Suhodol is about 5.5 kilometers long. Apart from the tunnel Grabosječ, the major works that are being done in this subsection are bridges Lepenica 1 238 meters long and Lepenica 2, 219 meters long. The deadline for completion of the subsection Lepenica–Suhodol is by the end of 2014.

(Source: Klix.ba)

Mortar shell removed from Skenderija
Today is 28th Anniversary of the Murder of Bosniaks in Ahmici Village
Caritas raises Alarm over Plight of migrants in Bosnia
UN Special Rapporteur on the Human Tights​ of Migrants to visit BiH
Yellow Alarm issued due to low Temperatures
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Presentation of Foreign Trade Data of B&H with the World Tomorrow
Next Article Proposal Protocol to Establish a Joint Center for Police Cooperation Defined
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Investigation into the “Sarajevo Safari” in Italy, but there is still insufficient Evidence for a Trial
June 21, 2026
The 27th traditional Meeting of BiH Supplementary Schools in the United Kingdom held in Coventry
June 21, 2026
After Being Set on Fire, the New BiH and RBiH Flags Redisplayed
June 21, 2026
Professor Pettigrew sends An Urgent Appeal to Safeguard Memorialization Rights and Prevent Historical Revisionism in Kalinovik
June 21, 2026
Brcko limits Salary Growth in the Public Sector to Half of Inflation
June 21, 2026
Financial Institutions reacted after BiH was placed on the Gray List
June 21, 2026
Dragons prepare for Qatar: Training completed in Salt Lake City
June 21, 2026
Zeljkovic: “We didn’t deserve a heavy Defeat, Everything is still in our Hands”
June 21, 2026
The Most Beautiful Photo from BiH since the Beginning of the World Cup
June 21, 2026
Pride Parade in Sarajevo with Messages of Equality and Fight against Discrimination
June 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?