By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Republika Srpska Entity launched Tendering for a Concession to install Solar Power Plant
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Republika Srpska Entity launched Tendering for a Concession to install Solar Power Plant
BUSINESS

Republika Srpska Entity launched Tendering for a Concession to install Solar Power Plant

Published: March 27, 2020
Share
SHARE

 

The Ministry of Industry, Energy, and Mining of the Republic of Srpska has launched tendering for a concession to install a 60 MW solar power plant in Bileća municipality, in Bosnia and Herzegovina, Balkan Green Energy News reports.

According to local media reports, energy producer and trader EFT, owned by Vuk Hamović, is interested in building the power plant.

The deadline to submit bids is April 13.

Company EFT is interested in the construction of solar power plant in Bileća municipality

Pursuant to Article 16 of the Law on Concessions and the Decision of the Government of the Republic of Srpska on initiating the procedure of awarding a concession for the construction of a solar power plant in the Bileća municipality, the ministry announces a public invitation for the submission of bids, according to the text of the announcement.

The estimated value of the investment is EUR 35.7 million

The construction of a solar power plant, with an estimated annual output of 84 GWh of electricity, is envisaged near the Skrobotno village, on the right side of the Trebinje – Bileća road, towards the Bileća Lake, at a location about one kilometer away from the road.

The power plant will be installed on 133 hectares

The estimated value of the investment is BAM 70 million (EUR 35.7 million), while electricity will be sold on the market.

The concession is to be awarded for 50 years

The plant will be installed on 133 hectares of land owned by the Republic of Srpska, the Bileća municipality and private owners.

The average annual energy generated per square meter of horizontal surface at the location is 1.52 GWh

According to the available data and preliminary analysis of the solar energy potential at the planned site, the average annual energy generated per square meter of a horizontal surface is 1.52 GWh.

The Republic of Srpska grants a concession for a maximum period of 50 years, and the minimum concession fee is equal to an on-off concession fee of BAM 700,000 (EUR 357,000) and a concession fee for the exploitation of BAM 0.0055 (EUR 0.0028) per kWh of electricity generated.

SPARK calls on Entrepreneurs to present their Ideas
Workplaces for 200 Young People: Opening of the Largest Shopping Center “Real” in Kakanj
Aluminij produced its Three Millionth ton of liquid Metal since its Creation
Wizz Air revises EX-YU Network as Winter Season nears
The Trade Union Consumer Basket For May Amounts To 3.178.40 BAM
TAGGED:#BiH#econmy#plant#powerPlant#RS#solarBUSINESSconcession
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Coronavirus-positive young Man threatened to jump from 5th Floor in Banja Luka
Next Article Bosnians who are currently in Italy to arrive to Sarajevo Today and enter Quarantine immediately
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Ban on the Symbol of the Army of the Republic of BiH goes before the Constitutional Court
August 22, 2026
Active Fires at several Locations near Trebinje
August 22, 2026
International Day of Remembrance for Victims of Violence Based on Religion or Belief
August 22, 2026
Large Road Corridor is being launched, it will also pass through BiH
August 22, 2026
Cantonal Police confirms: Not a single Incident at more than 50 Public Gatherings
August 22, 2026
Who Is Lobbying for Bosnia and Herzegovina’s Interests?
August 22, 2026
Prixx Cineplexx Audience Award Goes to THE WIDOWER
August 22, 2026
Situation at the Fire Site near Bosansko Grahovo is stable after the Rain
August 22, 2026
Paleocrassas: Being Observed Without Judgment can be Surprisingly Empowering
August 22, 2026
One of the most Modern Planes in the World landed at Sarajevo Airport
August 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?