By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Terrain for the Construction of Wind Farm Hrgud is being prepared
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Terrain for the Construction of Wind Farm Hrgud is being prepared
BUSINESS

Terrain for the Construction of Wind Farm Hrgud is being prepared

Published: February 2, 2018
Share
SHARE

Elektroprivreda of the RS (ERS) announced an international public call for the procurement of consulting services within the project of Wind Farm Hrgud.

The ERS concluded a concession contract with the Ministry of Industry, Energy and Mining of the RS with the aim to realize this project, according to which the planned period of time needed for the construction of a wind farm is three years, of which two years is needed for preparatory activities, and a year for the actual construction.

The main aim of this program is to increase the share of renewable energy in BH energy system and improve the economic situation in the region. The feasibility study for the Wind Farm Hrgud (WF Hrgud) was created for this purpose.

The total planned costs of the WF Hrgud were estimated at 65 million EUR.

The Government of the Federal Republic of Germany provided a grant in the total amount of 200,000 EUR for cofinancing of ESIA, including optional services.

To recall, the realization of project “Hrgud” in the RS includes the construction of a wind farm with installed capacity of 48 megawatts, and the estimated net annual production is 126 GWh of electricity, and the area of Hrgud is located at the altitude between 960 and 1,100 meters and occupies an area of about 5 square kilometers.

The construction of the wind farm “Hrgud” represents an obligations from the Action Plan for the Construction of Renewable Energy Sources by 2020, which was adopted by the Government of the RS.

(Source: akta.ba)

 

When will the increased Disability Allowances be paid?
More Prosecutions are still needed for War Crimes Committed in Conflicts in Former Yugoslavia
Take a Look how Sarajevo Newspaper marked 25th November back in 1943
Ambassador Makarevic pointed on the Advantages BiH has
Film “Son” directed by Ines Tanovic is a BiH Academy Award nominee for Oscar
TAGGED:#BiH#elektroprivredaRS#projectthe RSwind farm Hrgud
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article The total Debt of the FBiH Government decreased, and now amounts to about 5.6 Billion BAM
Next Article What is the exact Amount of Money invested in BiH in 2017?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

BiH National Team Begins Nations League Preparations with Training at Grbavica Stadium
September 22, 2026
Sarajevo to host 5th Vils Ultramarathon
September 22, 2026
Becirovic and Konakovic at the 81st Session of the UN General Assembly in New York
September 22, 2026
The Indictment for the Tram Accident in Sarajevo returned to the CS Prosecutor’s Office for Revision
September 22, 2026
Energy and Industrial Transformation in the Focus of the 4th Sarajevo Energy and Climate Week
September 22, 2026
Dodik: All Imposed Reforms and Solutions Must Be Annulled
September 22, 2026
Becirovic with the UN SG: The Resolution and the ‘Flower of Srebrenica’ Monument are a lasting Legacy
September 21, 2026
Puerto Flamenco Concludes BiH Mini-Tour with Final Performance in Tuzla
September 21, 2026
Media close to Juventus: Alajbegovic’s Rise changes Juventus’s Plans
September 21, 2026
Case “Catering”: Proposed Extension of Detention for Arnautovic and Others for another Two Months
September 21, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?