By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Take a Look at the Interior of Sarajevo Tower (Gallery)
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Take a Look at the Interior of Sarajevo Tower (Gallery)
BUSINESS

Take a Look at the Interior of Sarajevo Tower (Gallery)

Published: June 4, 2017
Share
SHARE

[wzslider autoplay=”true”]

Three months ago, the construction of modern residential and business complex “Sarajevo Tower”  started in Sarajevo, and the video presentation of the planned interior of the building was released a few days ago.

Among others, it is planned for Sarajevo Tower to have a total of 26 floors and 3 underground floors for garages. A shopping center will be located on 3 floors, while 2 floors are planned for penthouse apartments, the 25th and 26th floor.

Sarajevo Tower, which will be located in Kolodvorska Street, will occupy an area of 76,000 square meters, and it will include 334 housing units and flexible system that provides the opportunity of repackaging units depending on the needs of the market. This building will include 507 parking spaces and 7,223 square meters of office space. The quality of materials that will be used for the construction of this facility, as investors claim, are in accordance with the strictest standards in the field of construction engineering.

Sarajevo Tower represents an investment of 100 million BAM, which ANS Drive from BiH will share with “Smart Invest” from Kuwait.

The building will have two entrances for citizens and a special road access from Kolodvorska Streets. The building will have 8 fast elevators that will climb and descent speed at 2.5 meters per second, as well as two freight elevators.

(Source: klix.ba)

Peter Sorensen Opened the International Economic Fair “Mostar 2013”
BiH to adopt National renewable energy Action Plan?
How Much Are Bosnia and Herzegovina’s Gold Reserves Worth?
Fund of Slovenia paid 22 Million Euros to Depositors in BiH
BH Miracle: Vegetables Sold 15 Years in Advance
TAGGED:#complex#interior#sarajevomodern buildingSarajevo Tower
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Chinese cargo plane delivers relief to flood-hit Sri Lank
Next Article Clinton compared Trump with Milosevic
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Sky Alps Airline signs new Contract with Mostar Airport
November 10, 2026
Bosniak Organizations from the U.S. seek Visa Restrictions for Dodik
November 10, 2026
Dragons held a Training Session in Butmir
November 10, 2026
SDA announces the Takeover of Power in Sarajevo
November 10, 2026
Delegations Pay Tribute to Victims at Kazani: The Crime must have a Name, and the Victims Dignity”
November 10, 2026
Mayor of Sokolac Meets COM EUFOR at Camp Butmir
November 9, 2026
Acting High Representative Crishock at Kazani: “We owe them lasting remembrance”
November 9, 2026
Employers call for a Reduction in electricity Prices and other Business Pressures
November 9, 2026
33rd Anniversary of the destruction of the Old Bridge marked by a Jump without Applause
November 9, 2026
Minic assumed the Mandate of the President of the RS
November 9, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?