By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Tesanj – another BiH City facing Water Shortages
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > Tesanj – another BiH City facing Water Shortages
OTHER NEWSOUR FINDINGS

Tesanj – another BiH City facing Water Shortages

Published: August 18, 2024
Share
SHARE

Due to high temperatures, the citizens of Tešanj are facing restrictions in water supply these days.

Although the reductions are not official, they have been active for fifteen days. In the utility company, citizens are invited to save.

At the same time, the municipal government found itself the target of criticism due to the fact that it spent about three million marks in the construction of new wells in three years, and the reductions are still there.

Currently, 9,500 users or 30,000 residents are connected to the city’s water supply system, and these days they face unannounced water cuts.

“Very difficult. There is no water. “Whoever has, as they say, livestock, who has cattle, it’s normal that it’s difficult,” says Behija Kunalić, a resident of Tešanj.

“I guess it will be better. We expect rain and that’s it,” says Senada Kurtanović, a resident.

In the utility company, they point out that, despite the difficult hydrological situation, they deliver sufficient amounts of water to the network.

“Some four and a half thousand cubic meters is enough for normal water supply needs in the Tešanj municipality. We currently, here is the data from this morning, delivered 5,300 cubic meters”, says Hasan Handžić, director of JP Rad, Tešanj.

Of this quantity, only 300 cubic meters were delivered from the source of Mekiš-Stupa, which used to be the mainstay of the water supply.

“A capacity of less than five liters per second has never been recorded. “We currently have a situation where that flow has dropped to two liters per second,” adds Handžić.

A similar situation three years ago cost the former director of JP “Rad” a new mandate, who, then and now, holds the authorities in the municipality responsible.

“The utility company really did then, and I believe it is still doing now, both the management and the new director, everything in accordance with their capabilities and competences to manage what the founder gave it to manage”, claims Adnan Lihić, former director of JP Rad, Tesanj.

“We are currently keeping our system at a level of 22.38 percent of losses, and that is the best result in Bosnia and Herzegovina,” emphasized Handžić.

Despite requests to declare a state of natural disaster and reduce water supply, the authorities have not yet done so.

“It is, to put it mildly, a reduction. Whether it is of the first degree, or already of the second degree, the authorities need to declare it right now, but really after three years and after three million, this should not have happened”, Lihić added.

“If we hadn’t done what we did, we, like Tešanj, would have already had a month and a half to two reductions,” said Suad Huskić, head of Tešanj Municipality (SDA).

In the past two years, two new wells worth about 1.5 million marks were built in the catchment of the Usora River. A new one of 850,000 is planned, partially financed by the competent cantonal ministry from water fees.

“The municipality of Tešanj received about 640,000 marks and I think that after the city of Zenica it is the second that received the largest financial expenditure from that transfer,” said Jasmin Čajić, Minister of Agriculture, Forestry and Water Management of the ZDK (SDA).

The new well should be in operation by the end of the year. Until then, negotiations are underway with the neighboring municipality of Teslić on the urgent delivery of 20 liters of water per second.

“But we are also reviewing the possibility of deep wells, building a reservoir, and even filtering the Usora River,” said Huskić.

The preparation of the Study on Water Supply is underway, which should guide activities in this area for the next thirty years, Federalna writes.

Mountain Rescue Service in BiH richer for 22 Rescuers-Seekers
Mountain Rescue Service saved 26 Migrants who were lost in Pljesevica Mountain
Japan donates more than 150,000 BAM for Sarajevo School
Bosnian Marine wrote a Letter to US President Obama
Police Officer arrested during Distribution of Narcotics in Bosnia
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Pegasus Airlines Unveils New Istanbul-Tuzla Route
Next Article New Report on the attempted Assassination of Trump: Police Sniper hit the Attacker’s Rifle
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Historic First: Serbia Respects Hague Verdict Against Ratko Mladic Through Recommendation to Belgrade Mayor
July 24, 2026
EUFOR Marks the Change of Command of the German Contingent
July 24, 2026
Russian Gazprom increased the purchase Price of Gas to Energoinvest
July 24, 2026
Fatima Kurtic Fired in Luxembourg for Posting about Gaza: “They Wanted to Bury Us in BiH, but We Are Still Here”
July 24, 2026
Adem Jusic’s Death: Families Seek Truth, Seven Hospital Employees under Investigation
July 24, 2026
The Anniversary of the Crime in the Keraterm Camp in Prijedor
July 24, 2026
New Italian Rotation at the EUFOR Aviation Detachment
July 24, 2026
Chelsea and Italian Clubs interested in Kerim Alajbegovic
July 24, 2026
Traditional 460th Jumps from the Old Bridge on Sunday
July 24, 2026
Kupres Misses Out on 600 Jobs as German Investor Relocates Factory
July 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?