By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The construction of a new Bridge in RS to start soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The construction of a new Bridge in RS to start soon
OTHER NEWS

The construction of a new Bridge in RS to start soon

Published August 18, 2015
Share
SHARE

OLYMPUS DIGITAL CAMERAThe construction of a new bridge across the Ukrina River at the section of the regional road Gornja Vijaka dva – Razboj is to start today in Dragalovci near Stanari.

It was announced by the Public Enterprise “The Roads of the Republic of Srpska” that the construction will begin by introducing the contractor, the company “Prijedorputevi” Prijedor, to a job whose value is 1.147.116 BAM with VAT and the deadline of the execution of the works of six months.

The existing construction of the bridge in Dragalovci dates back from the fifties of the last century and is located at the confluence of Mala Ukrina River to the Velika Ukrina River, forming the Ukrina River after the bridge.

The bridge is located at an unfavourable place on the route of the road and represents a “black spot”, and the transverse cracks opened along the entire plate of the road, due to which the traffic across the bridge is suspended for the vehicles whose total mass exceeds five tons.

The existing bridge, besides not having the satisfying load capacity, also does not have satisfying elements of width and is therefore intended for one-way traffic. The new bridge must be fitted into the new route of the road whose track width is 5.5 meters and the width of the verge one meter.

The bridge should have a total length of 81.18 meters with 80 centimeters wide pedestrian tracks. The elaborate on the alterations in the traffic regime is a responsibility of the contractor, and a consent of the Ministry of Transportation and Communications of the RS must be given for it.

The building permit for the construction of the new bridge was issued by the Ministry of Physical Planning, Construction and the Environment of the Republic of Srpska on March 18th, while the professional and technical supervision of the construction of the bridge will be performed by the company “Inkoprom” from Banja Luka.

(Source: akta.ba/ photo dnevnik.hr)

Inter-Religious Council of Bosnia-Herzegovina condemns Attack on Church and Mosque

Accommodation in the Retirement Home in Banja Luka will be cheaper

Incomplete Remains of at least two Victims of the Past War found in Zavidovici

Payment of July Pensions to start Today

Memorial climb to Inač

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Milorad Dodik congratulates golden Basketball Players
Next Article The Title of the Champion of Europe celebrated on the Streets across B&H
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

“For him, BiH was not just a Name – it was a Mother, a Sanctuary, a Framework of Life”
April 10, 2026
EUFOR Hosts Visit of German Delegation
April 10, 2026
Hours of Waiting over Introduction of the new EES System and Holiday Crowds
April 10, 2026
Estimated Damages of Iran in War against Israel and the US
April 10, 2026
Where to Watch the World Cup: Broadcasters for Viewers in BiH Revealed
April 10, 2026
Representatives of Sinopharm and the Chinese Embassy on multi-million dollar Investments in BiH
April 10, 2026
EUFOR Commander Strengthens Engagement with Local Communities in Travnik and Zenica
April 10, 2026
Minister Forto: We are looking for Investments in Projects in BiH in Washington
April 10, 2026
The European Union is fully introducing the EES System
April 10, 2026
A Move by 14-Year-Old Afan Cizmic Attracted Global Attention
April 10, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?