By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The construction of a new Bridge in RS to start soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The construction of a new Bridge in RS to start soon
OTHER NEWS

The construction of a new Bridge in RS to start soon

Published: August 18, 2015
Share
SHARE

OLYMPUS DIGITAL CAMERAThe construction of a new bridge across the Ukrina River at the section of the regional road Gornja Vijaka dva – Razboj is to start today in Dragalovci near Stanari.

It was announced by the Public Enterprise “The Roads of the Republic of Srpska” that the construction will begin by introducing the contractor, the company “Prijedorputevi” Prijedor, to a job whose value is 1.147.116 BAM with VAT and the deadline of the execution of the works of six months.

The existing construction of the bridge in Dragalovci dates back from the fifties of the last century and is located at the confluence of Mala Ukrina River to the Velika Ukrina River, forming the Ukrina River after the bridge.

The bridge is located at an unfavourable place on the route of the road and represents a “black spot”, and the transverse cracks opened along the entire plate of the road, due to which the traffic across the bridge is suspended for the vehicles whose total mass exceeds five tons.

The existing bridge, besides not having the satisfying load capacity, also does not have satisfying elements of width and is therefore intended for one-way traffic. The new bridge must be fitted into the new route of the road whose track width is 5.5 meters and the width of the verge one meter.

The bridge should have a total length of 81.18 meters with 80 centimeters wide pedestrian tracks. The elaborate on the alterations in the traffic regime is a responsibility of the contractor, and a consent of the Ministry of Transportation and Communications of the RS must be given for it.

The building permit for the construction of the new bridge was issued by the Ministry of Physical Planning, Construction and the Environment of the Republic of Srpska on March 18th, while the professional and technical supervision of the construction of the bridge will be performed by the company “Inkoprom” from Banja Luka.

(Source: akta.ba/ photo dnevnik.hr)

Chief Prosecutor met with Project Manager of the project Countering Serious Crime in the WB
Announcement from Weather Bureau: It Will be Warm in October
Public Call for Award on Contribution to Achieve Gender Equality in 2013
Holy Month of Ramadan begins, the first Tarawih Prayer tonight
A peaceful Gathering after the Death of a young Doctor to be organized in Sarajevo
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Milorad Dodik congratulates golden Basketball Players
Next Article The Title of the Champion of Europe celebrated on the Streets across B&H
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

BiH Foreign Minister to participate in the Ministerial Meeting of the Berlin Process
September 30, 2026
The Poles “Fear” the Dragons: Bosnia and Herzegovina Is Growing into the Second Force in Group IV
September 30, 2026
Historic Success for Adnan Alagic: Three Gold Medals, Fifth World Champion Title, and Athlete of the Year Recognition
September 30, 2026
The Border Police of BiH receives a renovated Patrol Vessel from the USA
September 30, 2026
Council of Europe Postpones Decision on Resolution Addressing the Sarajevo Safari
September 30, 2026
Two-day Session of the HJPC of Bosnia and Herzegovina begins Today
September 30, 2026
Poverty is rising in BiH; nearly 19,000 People come to Soup Kitchens for a Meal
September 30, 2026
The OSCE Mission in BiH calls for Respect for the Freedom of Peaceful Assembly and Expression
September 30, 2026
BiH has the oldest Vehicle Fleet in Europe, new Rules for importing Vehicles are being introduced
September 30, 2026
The Hague Convict Jadranko Prlic requests early Release
September 30, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?