By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The construction of a new Bridge in RS to start soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The construction of a new Bridge in RS to start soon
OTHER NEWS

The construction of a new Bridge in RS to start soon

Published: August 18, 2015
Share
SHARE

OLYMPUS DIGITAL CAMERAThe construction of a new bridge across the Ukrina River at the section of the regional road Gornja Vijaka dva – Razboj is to start today in Dragalovci near Stanari.

It was announced by the Public Enterprise “The Roads of the Republic of Srpska” that the construction will begin by introducing the contractor, the company “Prijedorputevi” Prijedor, to a job whose value is 1.147.116 BAM with VAT and the deadline of the execution of the works of six months.

The existing construction of the bridge in Dragalovci dates back from the fifties of the last century and is located at the confluence of Mala Ukrina River to the Velika Ukrina River, forming the Ukrina River after the bridge.

The bridge is located at an unfavourable place on the route of the road and represents a “black spot”, and the transverse cracks opened along the entire plate of the road, due to which the traffic across the bridge is suspended for the vehicles whose total mass exceeds five tons.

The existing bridge, besides not having the satisfying load capacity, also does not have satisfying elements of width and is therefore intended for one-way traffic. The new bridge must be fitted into the new route of the road whose track width is 5.5 meters and the width of the verge one meter.

The bridge should have a total length of 81.18 meters with 80 centimeters wide pedestrian tracks. The elaborate on the alterations in the traffic regime is a responsibility of the contractor, and a consent of the Ministry of Transportation and Communications of the RS must be given for it.

The building permit for the construction of the new bridge was issued by the Ministry of Physical Planning, Construction and the Environment of the Republic of Srpska on March 18th, while the professional and technical supervision of the construction of the bridge will be performed by the company “Inkoprom” from Banja Luka.

(Source: akta.ba/ photo dnevnik.hr)

Tram Traffic Suspended Due to the Collapse of Miljacka’s Riverbed Wall
Large amount of illegal weapons seized in BiH
Passengers to use Universal Single Ticket for both Carriers in Canton Sarajevo
Snowman “enjoys” the sounds of Saz
A ski lift with six seats started running on Jahorina
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Milorad Dodik congratulates golden Basketball Players
Next Article The Title of the Champion of Europe celebrated on the Streets across B&H
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Plane carrying Ratko Mladic’s Body lands in Belgrade
September 3, 2026
POSKOK files an Indictment against Federal Minister Vojin Mijatovic
September 3, 2026
Distinguished Visitors Day Marks the Culmination of Exercise Quick Response 2026
September 3, 2026
International Residual Mechanism for Criminal Tribunals hands over Remains of Ratko Mladic to next of Kin
September 3, 2026
From Glorification to Profit: The Image of Ratko Mladic Was Used for Paid Ads
September 3, 2026
The First BiH Drones attracted the most Attention at the Defense Industry Fair
September 3, 2026
Vucic: Ratko Mladic’s Body Recovered, Expected to Arrive in Serbia This Afternoon
September 3, 2026
“Quick Response 2026”: Preservation of Peace and Security is a common Interest of all of us
September 3, 2026
Technology for Trust: Democracy starts at the Ballot Box, protecting every Vote is protecting Democracy
September 3, 2026
BiH Border Police prevent 96 People from illegally crossing the Border
September 3, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?