By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Construction of another Wind Farm in Bosnia is underway
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Construction of another Wind Farm in Bosnia is underway
BUSINESS

The Construction of another Wind Farm in Bosnia is underway

Published: January 17, 2023
Share
SHARE

Five days ago, the Government of the Federation of Bosnia and Herzegovina (FBiH), at the proposal of the Federal Ministry of Energy, Mining and Industry, adopted information on activities and gave prior approval to this Ministry in the process of issuing an Energy License to the company Imres d.o.o. Livno, for the construction of the Siroka Draga wind farm in the mountainous area of the Kamesnica hill, in the area of the municipalities of Livno and Tomislavgrad.

The information, among other things, states that the project envisages the positioning of 19 wind turbines with a unit power of 6.6 MW, a total installed power of 125.4 MW (19×6.6 MW), and a planned annual electricity production of 403 GWh.

The Siroka Draga wind farm project was started in 2009 with continuous monitoring of wind speed and direction. Based on the obtained data, it was concluded that the mentioned location offers a huge resource potential.

The information also contains the chronology of activities and the status of the Siroka Draga wind farm construction project.

In accordance with the current regulations in the field of energy, for the construction of new and reconstruction of existing power generation facilities in the FBiH, whose installed capacity is greater than 30 MW, the Federal Ministry of Energy, Mining, and Industry issues an energy permit with the prior consent of the Government and the Parliament of FBiH.

The Prime Minister of the FBiH is responsible for sending the information on the activities in the process of issuing the Energy License to the company Imres d.o.o. Livno, with the conclusion, to the Parliament of the FBiH for consideration and adoption, Biznis Info reports.

E.Dz.

Another 74 million BAM for the Highway between Zenica and Doboj
Yellow Meteoalert was issued for Parts of BiH
Referendum on Impeachment of the Mayor in Bratunac
Fourteen Thousand Packs of Cigarettes without Excise Stamps seized in Bosnia and Herzegovina
BiH has the third lowest fuel prices in Europe
TAGGED:#business#new#news#technology#windfarm
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article BiH Council of Ministers Chairperson to participate in the World Economic Forum
Next Article How Petar Corluka became the first Billionaire in Herzegovina
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Schoolgirl who attacked Peers with a Knife under Police Surveillance
September 5, 2026
EU4ADMIN Project Concludes After Nearly Three Years of Work to Improve BiH’s Official Statistics
September 4, 2026
Red Bull Soapbox Race Brings 40 Homemade Vehicles and a Day of Fun to Sarajevo
September 4, 2026
Puerto Flamenco brings the Authentic Spirit of Spain to Three Cities in BiH
September 4, 2026
Pilots of the Sarajevo Canton MoI: “In the Cockpit, there is no Room for Fatigue, Stress, or Wrong Judgment”
September 4, 2026
“Public Resources are used as Political Capital, and Sanctions are absent”
September 4, 2026
Armed Forces of Bosnia and Herzegovina increased Resources for Firefighting
September 4, 2026
Quick Response 2026: When Readiness Is More Than Words
September 4, 2026
BiH FM in Dublin: EU Enlargement Is a Strategic and Security Need for Europe
September 4, 2026
Twelve Candidates on the List for President and Vice Presidents of Republika Srpska
September 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?