By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Construction of another Wind Farm in Bosnia is underway
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Construction of another Wind Farm in Bosnia is underway
BUSINESS

The Construction of another Wind Farm in Bosnia is underway

Published: January 17, 2023
Share
SHARE

Five days ago, the Government of the Federation of Bosnia and Herzegovina (FBiH), at the proposal of the Federal Ministry of Energy, Mining and Industry, adopted information on activities and gave prior approval to this Ministry in the process of issuing an Energy License to the company Imres d.o.o. Livno, for the construction of the Siroka Draga wind farm in the mountainous area of the Kamesnica hill, in the area of the municipalities of Livno and Tomislavgrad.

The information, among other things, states that the project envisages the positioning of 19 wind turbines with a unit power of 6.6 MW, a total installed power of 125.4 MW (19×6.6 MW), and a planned annual electricity production of 403 GWh.

The Siroka Draga wind farm project was started in 2009 with continuous monitoring of wind speed and direction. Based on the obtained data, it was concluded that the mentioned location offers a huge resource potential.

The information also contains the chronology of activities and the status of the Siroka Draga wind farm construction project.

In accordance with the current regulations in the field of energy, for the construction of new and reconstruction of existing power generation facilities in the FBiH, whose installed capacity is greater than 30 MW, the Federal Ministry of Energy, Mining, and Industry issues an energy permit with the prior consent of the Government and the Parliament of FBiH.

The Prime Minister of the FBiH is responsible for sending the information on the activities in the process of issuing the Energy License to the company Imres d.o.o. Livno, with the conclusion, to the Parliament of the FBiH for consideration and adoption, Biznis Info reports.

E.Dz.

Record Number of COVID Positive Persons in Sarajevo
Can the new FBiH Government be formed without Vice-President’s Signature?
2,000 New Workplaces by Exploiting Biomass
Parents of Children with Disabilities have been deprived of their Right to Vehicle Registration
Chairperson of CoM to participate in Summit for Democracy in Washington
TAGGED:#business#new#news#technology#windfarm
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article BiH Council of Ministers Chairperson to participate in the World Economic Forum
Next Article How Petar Corluka became the first Billionaire in Herzegovina
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Construction of the New Mostar Airport Terminal Worth 1.5 Million Begins
May 16, 2026
He Was a Yugoslav Sports Legend, Now Facing Hard Times: “I Collect Bottles, I Am Not Ashamed”
May 16, 2026
New Adrenalin Attraction Overlooking the Neretva: Via Ferrata “Prenjska Vrata” for the Brave and Adventurous
May 16, 2026
A Major Turnaround in Pretis: Instead of Huge Profit – a Multi-Million Loss
May 16, 2026
Motorway Sections in the Federation of Bosnia and Herzegovina to Open in 2026
May 16, 2026
Modest Economic Recovery: Can Bosnia and Herzegovina Sustain a Positive Trend?
May 16, 2026
“The CHALLENGE” Exhibition on Italian Sports Design Opens at the Olympic Museum Sarajevo
May 16, 2026
Uk to Dodik: The Economy does not know Political Tensions, Sarajevo is a European city where Everyone is welcome
May 16, 2026
Flowers and Memorial Service for fallen Soldiers from the Tuzla Column
May 16, 2026
Council of Europe and OSCE leadership revive extended High-Level Meetings to foster effective Multilateralism
May 16, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?