By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Construction of Sarajevo Airport’s new Terminal Building is entering its final Phase
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BH TOURISM > The Construction of Sarajevo Airport’s new Terminal Building is entering its final Phase
BH TOURISM

The Construction of Sarajevo Airport’s new Terminal Building is entering its final Phase

Published: February 19, 2023
Share
SHARE

The construction of Sarajevo Airport’s new terminal building is entering its final phase, with work expected to be completed this year. The new building is spread out over four floors and 10.000 square metres.

It will feature twelve check-in desks, five gates and one glass air bridge, which has already been mounted and connected to the building.

The airport’s two existing airbridges will be replaced to match the newly installed one. The new facility is linked to the existing terminal to form a single functioning unit with the capacity to handle two million passengers per year.

The airport is in the process of setting up a new automated Baggage Handling System. Work on the expansion of the airport’s apron is also ongoing. Once completed, it will boast eleven aircraft parking positions, up from the current seven.

As a result, Sarajevo Airport’s handling capacity will be increased by 60%. It will be accompanied by extensive work on the airport’s electrical installations and sewerage.

In the coming period, the airport plans to extend its runway by 550 metres. It has already purchased 60.000 square metres of land to do so and has begun clearing the terrain, Ex Yu Aviation news portal reports.

Court of BiH sentenced Two Persons to 16 Years Inprisonment for War Crime against the Civilian Population
Sledding returns to Sarajevo: Technical Course for Coaches in Sledding
Group that has been monitored since 2019 was arrested: They smuggled Drugs and Weapons into the EU
Opening of Swissotel in Sarajevo announced for 2018
Prime Minister of USC sends Harsh Message to Authorities in Sarajevo
TAGGED:#airport#business#news#sarajevo
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article The Solar Park with over Two Thousand Solar Panels is operational in BiH
Next Article Rescuers from FBiH were welcomed in Sarajevo after returning from Turkey
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

A New Chapter for Austria’s EUFOR Contingent
September 30, 2026
Football Association of BiH invited the Fans to a special Move for Dzeko’s Farewell
September 30, 2026
Ursula von der Leyen is starting a Three-day Visit to the Western Balkans
September 30, 2026
CEC BiH holds a Meeting with Ambassadors gathered around the “Friends of the Western Balkans” Group
September 30, 2026
UEFA appoints Referees for the Match Bosnia and Herzegovina – Sweden
September 30, 2026
Canton Sarajevo establishes a Protocol on urgent Care of Patients
September 30, 2026
Fourth Decade of Success: Preserving Bosnian Language and Connecting Generations in the Heart of the United Kingdom
September 30, 2026
BiH Foreign Minister to participate in the Ministerial Meeting of the Berlin Process
September 30, 2026
The Poles “Fear” the Dragons: Bosnia and Herzegovina Is Growing into the Second Force in Group IV
September 30, 2026
Historic Success for Adnan Alagic: Three Gold Medals, Fifth World Champion Title, and Athlete of the Year Recognition
September 30, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?