By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The First Biomass Power Plant worst 10 Million BAM to be opened in BiH
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The First Biomass Power Plant worst 10 Million BAM to be opened in BiH
BUSINESS

The First Biomass Power Plant worst 10 Million BAM to be opened in BiH

Published: October 29, 2018
Share
SHARE

The first biomass power plant in Bosnia and Herzegovina will be opened in November in Knezevo.

The building is built within the complex of the wood industry “Nomar” which operates within the group “Fagus” from Kotor Varoš and the total investment amounts to ten million BAM.

This will be the first object in BiH to produce electric and heat energy by using biomass.

The projected thermal power is five megawatts, and for the production of electricity, it will be 820 kilowatts of kilowatts. The owner of the company “Fagus” Miroslav Malijevic said for portal “Glas Srpske” that the works on the factory are in its final phase.

“We will produce heat and electricity at the same time, and it will be made by wood waste which is usually taken in order to have a smooth wood processing. With this, we will solve the problem of waste disposal and produce heat energy that will serve us to produce pellets. The electrical energy we produce will be delivered to “Elektroprivreda RS”, stated Malijevic.

He emphasized that the company’s plan for pellet production is to start in spring 2019, and that with this investment, thet will create the opportunity for additional employment of workers and, on the other hand, create environmentally healthy and clean energy from renewable sources.

“We plan to hire 30 workers, and later, by expanding the business, there will be more jobs open. Necessary is for staff to be educated, “ concluded Malijevic.

(Source: biznisinfo)

 

 

Prices of Phone Calls in BiH to be decreased?
When will BiH get Permission for Export of 13,000 Tons of Meat to Turkey?
Number of Employees in Bosnia and Herzegovina decreased by almost Twenty Thousand!
BiH receives a Grant from the World Bank worth 16 million BAM
BiH Presidency Chairman meets with the US President
TAGGED:#BiH#factory#investment#kotorvaros
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Day of Mourning on the Territory of whole BiH Today
Next Article Interesting Story about Russian Couple who moved to Sarajevo
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Minister Isak: “Police Agencies are doing their Job, the Security Situation is satisfactory”
August 12, 2026
COM EUFOR Continues Dialogue with Local Authorities in Rudo and Cajnice
August 12, 2026
Five Million BAM for Social Protection throughout the Federation of BiH
August 11, 2026
Where Have the Major Election Irregularities Been Recorded and Will the New Technologies Finally Resolve the Problem?
August 11, 2026
The Former US General Arrives in Bosnia and Herzegovina: Who Is Ronald Johnson, a New US Ambassador?
August 11, 2026
Funds for Miners’ Wages Secured, Remaining in the Methane Mine Pit Unacceptable
August 11, 2026
Political Crisis in the Una-Sana Canton
August 11, 2026
Interview with Sarajevo Mayor: “Summit should bring concrete Projects and stronger Cooperation between Cities”
August 11, 2026
Ginex Continues to Generate Revenue: Half-Year Profit Exceeds 12 Million BAM
August 11, 2026
Has Bosnian Diaspora Gave Up on Republika Srpska?
August 11, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?