By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Highway Zepce – Tuzla – Brcko – Orasje to be constructed
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > The Highway Zepce – Tuzla – Brcko – Orasje to be constructed
OTHER NEWS

The Highway Zepce – Tuzla – Brcko – Orasje to be constructed

Published: December 28, 2015
Share
SHARE

highway2The Ministry of Transport and Communications of the FB&H is planning to literally turn FB&H into a huge construction site within the next 4 years, with the largest amount of funds intended for continuation of the construction of several sections of the highway, as well as the construction and modernization of highways and regional roads, according to Vecernji List B&H.

About 360 million BAM is planned for investment in the construction or completion of already started main roads and highways, reconstruction of the slow lane, tunnels, bridges, black spots, bypass in the crowded urban areas and the rehabilitation of damages after floods, in the following 4 years.

Thus, the maximum amount of money will be directed for the construction of section Pocitelj – Zvirovici, then section Mostar – Pocitelj, Zenica bypass, and sections of the highway Svilaj – Odzak ( in the length of 10.7 kilometers). Besides these projects, the Ministry of Transport and Communications of FB&H is planning to work on the design of project of the highway between Tuzla and Orasje, as well as activities regarding project documents and other preparations for the highway Zepce – Tuzla – Brcko – Orasje and the Adriatic-Ionian highway through B&H.

One of the most important preparatory projects is linked to the project of high-speed road on the section Mostar – Siroki Brijeg – Grude – the border with Croatia.

roadsMost of the money from the main roads will go next year on completing of the road Neum – Stolac, which will connect the only city in Herzegovina at sea with the interior.

Moreover, the southern bypass of Mostar will be constructed, and the reconstruction and construction of the main road between Tuzla and Sarajevo will take place as well, the construction of a new main road from Bihac to Bosanska Krupa will be started, as well as the modernization of the section Jajce – Lasva and Izacic – Bihac. Road Sarajevo – Gorazde will be done in the 2-year period, road Sanski Most – Kljuc will be modernized and road Grude – Ljubuski – Capljina will be constructed.

(Source: akos.ba)

34 Million BAM worth Children Hospital to be built in Mostar
Take a look at the first Student Dormitory for Women “Dorrah”
Sarajevo Mayor celebrated Eid with her Fellow Citizens
Beautiful Winter Scenery of Plitvice Lakes gathered the Stars of Instagram
Mortal Remains of War Victims found near Travnik
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Edin Forto returned 5188 BAM of Flat Rate to the Budget of the CS
Next Article Association “Ganganet” presented a Virtual Guide through Herzegovina
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

BiH Footballer Kerim Alajbegovic says Goodbye to Austrian Red Bull Salzburg
May 16, 2026
Podgorica and Belgrade exchange messages after Vucic’s Statement on Montenegro’s Independence Day
May 16, 2026
Budimir: We have the most prepared Police Agency in BiH
May 16, 2026
Construction of the New Mostar Airport Terminal Worth 1.5 Million Begins
May 16, 2026
He Was a Yugoslav Sports Legend, Now Facing Hard Times: “I Collect Bottles, I Am Not Ashamed”
May 16, 2026
New Adrenalin Attraction Overlooking the Neretva: Via Ferrata “Prenjska Vrata” for the Brave and Adventurous
May 16, 2026
A Major Turnaround in Pretis: Instead of Huge Profit – a Multi-Million Loss
May 16, 2026
Motorway Sections in the Federation of Bosnia and Herzegovina to Open in 2026
May 16, 2026
Modest Economic Recovery: Can Bosnia and Herzegovina Sustain a Positive Trend?
May 16, 2026
“The CHALLENGE” Exhibition on Italian Sports Design Opens at the Olympic Museum Sarajevo
May 16, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?