By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Problem of Počitelj Solved: The Longest Bridge on the Corridor Vc will be Projected
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Problem of Počitelj Solved: The Longest Bridge on the Corridor Vc will be Projected
BUSINESS

The Problem of Počitelj Solved: The Longest Bridge on the Corridor Vc will be Projected

Published: October 9, 2013
Share
SHARE

pociteljDirector of Public Highways of FB&H Ensad Karić, the director of IPSA Institute Amir Fejzić and the director of the company Divel, Elmedin Voloder , signed today the contract to provide services for the construction of the highway main project on the Corridor Vc, section Počitelj – Zvirovići.

The contract value is 1.757.780.00 euros and funds are provided by the grant of the European Investment Bank (EIB). The deadline for the construction project is 14 months from the contract signing.

The position of the highway near Počitelj is solved by singing of this contract. It will link Počitelj with Međugorje and the Croatian border. The position of the bridge at this section would be north of Počitelj, which will preserve the old town. In the construction and investment sector, the Corridor Vc pushes the boundaries because under this Agreement, the longest bridge on Corridor Vc will be projected, said on this occasion the Director of Public Highways of FB&H, Ensad Karić.

(Source: Indikator.ba)

How does BiH stand in terms of State Reserves of Gold?
EBRD interested in support of the reconstruction of Railway in BiH
Companies from BiH 9th Time on Hannover Messe
United Arab Emirates donated Respirators which cannot be used in Intensive Care
62 Thousand Poultry euthanized over Bird Flu in Republika Srpska
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Presentation of Eno Agri Project Financed by EU in Sarajevo Today
Next Article The Recognition “Ambassador of the University” Awarded to Prof. Yasir Suleiman
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Commemoration of the 34th Anniversary of the Suffering of Bosniaks in the Susica Camp
September 26, 2026
Dragons hold a Training Session in Warsaw ahead the Trip to Bucharest
September 26, 2026
Everything You Need to Know Before the Elections: CEC Publishes Detailed Lists and Instructions for Citizens
September 26, 2026
Bosnian Diaspora Files Complaints Against Swiss Magazine Weltwoche Reporting on War Criminal Mladic
September 26, 2026
UDIK remembers the Anniversary of the Closing of the Susica Camp near Vlasenica
September 26, 2026
Sarajevo Canton Ministry of Internal Affairs is acquiring new Special Armored Vehicles
September 26, 2026
FUZIP implements Measures from the FATF Action Plan to prevent Money Laundering
September 26, 2026
Linguistic Diversity Celebrated in Gorazde for European Day of Languages
September 26, 2026
Dispute over Licenses for Professional Drivers: Who issues valid Documents
September 26, 2026
Barbarez satisfied with BiH’s Performance after Draw with Poland
September 26, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?