By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Thermal Power Plant Stanari to start with Commercial Operation soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Thermal Power Plant Stanari to start with Commercial Operation soon
BUSINESS

Thermal Power Plant Stanari to start with Commercial Operation soon

Published: January 20, 2016
Share
SHARE

stanari (1)Beginning of commercial operation of thermal power plant Stanari is expected in May, as announced today after a meeting of Minister of Industry, Energy and Mining of RS Petar Djokic and technical director of the thermal power plant Savo Mirkovic.

The plants are in operation in capacity of 80 % or 240 megawatts, and Mirkovic said that they are switching to designed capacity of 300 megawatts in two days, and that test phase should last until February.

He emphasized that one-month trial operation will start in March, and the beginning of commercial operation is starting in May.

It is expected that 800 people will be hired in the power plant.

Thermal power plant Stanari started the first synchronization with the national power grid of B&H on the 4th of January this year.

(Source: novovrijeme.ba)

The FB&H Government: Ensured Funds for Industry Development
EU allocates over 3 Million BAM for Agri-Sector in Bosnia
National Company Koteks Tesanj presents its Products at “IWA Outdoor Classic 2018”
The largest BH Steelmaker ArcelorMittal announces 75 mln BAM Investment
Products of Tešanj Springs Soon in Entire Arabian Gulf
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Municipality Ilidza most visited in the CS
Next Article New Law: Only the Chair and his Deputies will have Advisors
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Pride Parade in Sarajevo with Messages of Equality and Fight against Discrimination
June 20, 2026
The Ilidza Fire Department received a valuable Donation from Slovenia
June 20, 2026
EU Delegation after the FATF Decision: Eliminating Shortcomings is crucial for BiH’s European Path
June 20, 2026
Penava Shifts the Tone: We Don’t Want “Herzeg-Bosnia,” and We Aren’t Bringing BiH into Question
June 20, 2026
The Only Image of Death in the Yugoslav War: EFJ Seeks To Strip Bojan Stojanović of an Award
June 20, 2026
The Dragons Could Face Germany in Knockout Stage, But Only in Theory: Here Is Who Barbarez’s Side Could Actually Draw
June 20, 2026
The Tenth Jubilee Edition of the Vucko Trail, the largest Trail Race in BiH
June 20, 2026
Great Anniversaries of Svrzo’s House and a unique Setting for Damir Imamovic’s Sevdah
June 20, 2026
Work on Corridor Vc Slowed Down: FBiH Government Extends Toll Suspension
June 20, 2026
Edin Dzeko is an Idol for the young Players
June 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?