By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Višegrad – Starts with the Works at the Bridge Mehmed Paše Sokolović
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Višegrad – Starts with the Works at the Bridge Mehmed Paše Sokolović
BUSINESS

Višegrad – Starts with the Works at the Bridge Mehmed Paše Sokolović

Published August 12, 2013
Share
SHARE

mostIn Višegrad the preparations for the continuation of Mehmed Paše Sokolović  Bridge reconstruction is being completed. 

According to the announcement of the Municipality Višegrad, tomorrow due to the start of work will close the road traffic, from the traffic light at the M5  on the left side of Drina until the steps of the raft.

The restoration of Mehmed Paše Sokolović Bridge in Višegrad will be implemented on the basis of the contract between the Turkish Agency for International Cooperation and Coordination (TIKA) and the Turkish construction company ER-BU.

At a recent meeting it was agreed that Hydroelectric Bajna Bašta to lower the lake level in order to continue further works on Višegrad’s bridge.

The plan is to empty the artificial lake hydroelectric power HE Bajna Bašta downstream of Višegrad from 26th to 30th August, and also the level of Drina, in order to carry out the works.

So far, around bridge on the Drina are done the preparatory works in order to start with the reconstruction of the bridge foundations.

According to previous announcements, the works on Višegrad’s bridge will last 600 days and their value is almost ten million KM and is financed by the Government of Turkey.

(Source: Fena)

 

BiH without a Chance to become a Member of the WTO for 22 Years now

Don’t pack your suitcase – SPARK yourself!

1.5 Million BAM worth Roundabout opened in Sarajevo

Chairman Tegeltija talked with Director of IMF for Europe Alfred Kammer

External Debt of BiH in 2024: FBiH owes more than RS – Who are the key Creditors

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article B&H Lottery Launched a Game of Luck on the Occasion of Sarajevo Film Festival
Next Article Project of De-mining of Sava Foundations Continues
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Rutte: NATO will not accept a Security Vacuum in BiH, let them think about what that could mean
February 13, 2026
BiH FM met with Irish Minister of State Thomas Byrne
February 13, 2026
Becirovic in Munich: Attacks on BiH are a Test of the Determination of Europe and the West
February 13, 2026
Uk: Responsibility of the CS Government Is to Ensure Conditions for Determining the True Causes of the Accident
February 13, 2026
ALU UNSA: Erdoan was a good, hardworking and always Smiling Soul
February 13, 2026
Meeting in Washington: Support for the Southern Interconnection
February 13, 2026
GRAS Union comments on The Cause of the Tram Accident
February 13, 2026
Last Year’s Turnover recorded by Fiscal Cash Registers was 25.3 Billion BAM
February 13, 2026
Confirmed Indictment in the Case of Dragan Jevtic and Others for Genocide
February 13, 2026
Sarajevo Canton declares a Day of Mourning
February 13, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?