By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: When will the New Neum-Stolac Road be fully built?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > When will the New Neum-Stolac Road be fully built?
BUSINESS

When will the New Neum-Stolac Road be fully built?

Published: September 1, 2021
Share
SHARE

Federal Minister of Transport and Communications Denis Lasic announced that the new road Stolac – Neum will be fully built and opened in the spring of next year.

“The construction of this section has been promised many times and the residents of Stolac and Neum have watched in disbelief if it will ever be completed. And here, we will finally bring it to an end in about half a year “, said Minister Lasic during the visit of the delegation of the Government of FBiH to the construction site of that road.

According to the director of the Roads of the Federation of BiH, Ljubo Pravdic, out of the total length of 36.5 kilometers, that section is still 10 kilometers away.

“Stolac and Neum will also benefit from the construction of this road. The road will be shortened, it will not go through the Republic of Croatia and there will be benefits for this whole area. Many said in disbelief at the beginning that it was promised for 40 years, but here we are all finished,” said Pravdic.

After the construction of the road Neum – Stolac, the construction of a bypass near Stolac will begin.

“It is a mini bypass that will be 1.3 kilometers long and the deadline for the completion of works after the completion of property-legal relations is about ten months, so we expect that it will be completed by October next year. So, the total length of the section is about 38 kilometers and the total value of the investment is 88 million marks “, said the director of Roads of the Federation of BiH.

Speaking about road construction in the Federation of BiH, Minister Lasic said that around one billion marks had been invested in the south of Herzegovina in the past period.

He reminded that 122 kilometers of the Vc corridor have been built so far, 40 kilometers are under construction and those kilometers will be open by the summer of 2022, a tender procedure is being carried out for 28 kilometers, and paperwork is being prepared for 90 kilometers. shares could be announced by spring 2022.

Minister Lasic announced that in the near future the focus of the Federal Ministry of Transport and Communications will be on more “neglected” parts of the Federation, such as the Tuzla region, then on the road from Mostar through Siroki Brijeg to the border with Croatia and the connection with Bihac.

After Price Increase: Meat is a Luxury for People in BiH
Another World Award for “Pino Nature Hotel”
Mercedes Benz recognized the Value of a Patent made by BH Inventor
Gas Price Increase requested in FBiH
Hundreds of Trucks from Across BiH to Converge on Sarajevo
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article PM Novalic: Economic Indicators in 2021 in BiH are extremely good
Next Article Delta Strain of the coronavirus has been detected in Republika Srpska
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

RS Constitutional Court: Bosniak Club’s Request for a Declaration on the Closure of the OHR is unacceptable
June 17, 2026
“I want the Euphoria around Dragons to last, it will be easier for us to play Switzerland”
June 17, 2026
Interview with Zvizdic: BiH cannot Progress on the European Path while SNSD is an important Political Factor
June 17, 2026
The National Assembly of Republika Srpska concluded its Special Session
June 17, 2026
The Football Team of BiH is leaving the Base in Salt Lake City
June 17, 2026
Dynamic Response 26-6: COM EUFOR Watches AF BiH Demonstrate Its Readiness
June 17, 2026
Rutte: The US is not withdrawing from Europe by announcing a Reduction in NATO Funding
June 17, 2026
Is the European Path or the European Halt?
June 17, 2026
Central Bank of BiH Unveils Commemorative Medallion Honoring the Nation’s World Cup Legacy
June 17, 2026
Three Persons arrested over Unauthorised Drug Production
June 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?