By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Wind Farm worth 35 Million Euros to be opened in Herzegovina
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Wind Farm worth 35 Million Euros to be opened in Herzegovina
BUSINESS

Wind Farm worth 35 Million Euros to be opened in Herzegovina

Published January 18, 2020
Share
SHARE

 

The Relaks company from Posusje, owned by businessmen Veljko Loncar (Vokel) and Tomislav Maric (KTM Brina), is working on a project to build the Ostrc hydroelectric plant on the Ostrc mountain above Posusje. The project is in the phase of obtaining an energy permit.

So far, the CoE has been issued with a location and environmental permit, the Indikator reports, referring to Grude.com news portal. Wind power and direction have been continuously monitored and recorded for five years with devices mounted on a 84-meter-high measuring pillar on Ostrce.

Based on the obtained data, all the necessary studies and studies were done showing that the Ostrc site is one of the best locations for the construction of wind farms in BiH.

The electricity from renewable energy source-wind, Ostrc wind power plant will produce with eight wind turbines with a total installed capacity of 28.2 MW.

The planned annual production is 94 GW / h of electricity and it is sufficient to supply all homes in Posusje, Grude and Ljubuski.

According to the Feasibility Study, the value of the Ostrc wind farm project is 35 million euros and it will be the largest investment in one project in the County of West Herzegovina.

On behalf of the concession fee, Relaks will pay a concession fee of 2.5% of the total value of electricity produced, and the fee will be split into two equal parts between the cantons and the Municipality of Posusje.

 

 

 

Breaking News: Chinese Tourists from Wuhan to arrive in Bosnia-Herzegovina Tonight

Commander EUFOR Trischak and EU Ambassador Sattler hand over EU Medical Aid in Banja Luka

Analysis: The Average Net Salary in the Federation of BiH

EC Directorate-General for Neighbourhood and Enlargement Negotiations confirmed the continued Support to the HJPC

Construction of the Peljesac bridge to start in 2017?

TAGGED:#BiH#Herzegovina#hydroepectric#plant#Posusje
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Bosnia International Forum to connect Bosnia-Herzegovina and Diaspora
Next Article EUFOR Multinational Battalion (MNBN) conduct an Exercise securing the Weapon Storage Site
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Avdic: The City of Sarajevo Continues to Cherish the Values of an Independent and Sovereign BiH
March 2, 2026
Who are the Candidates for Iran’s next Supreme Leader?
March 1, 2026
Komsic: The Strength of BiH is in its Bosnian way of life, let’s believe in our Country
March 1, 2026
Former Iranian President Mahmoud Ahmadinejad killed in Israeli-American Attacks
March 1, 2026
The Embassies of BiH in Tehran and Tel Aviv provide Support to Citizens
March 1, 2026
Trump says He will speak with Iranian Leaders, but did not specify when
March 1, 2026
Tehran in Mourning, the Attacks do not stop
March 1, 2026
Parade of Quads through Sarajevo on the Independence Day of BiH
March 1, 2026
Richmond Park Students Win Gold at First Lego League International Robotics Olympiad
March 1, 2026
OPEC Plus increases Oil Production in April
March 1, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?