By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Wind Farm worth 35 Million Euros to be opened in Herzegovina
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Wind Farm worth 35 Million Euros to be opened in Herzegovina
BUSINESS

Wind Farm worth 35 Million Euros to be opened in Herzegovina

Published January 18, 2020
Share
SHARE

 

The Relaks company from Posusje, owned by businessmen Veljko Loncar (Vokel) and Tomislav Maric (KTM Brina), is working on a project to build the Ostrc hydroelectric plant on the Ostrc mountain above Posusje. The project is in the phase of obtaining an energy permit.

So far, the CoE has been issued with a location and environmental permit, the Indikator reports, referring to Grude.com news portal. Wind power and direction have been continuously monitored and recorded for five years with devices mounted on a 84-meter-high measuring pillar on Ostrce.

Based on the obtained data, all the necessary studies and studies were done showing that the Ostrc site is one of the best locations for the construction of wind farms in BiH.

The electricity from renewable energy source-wind, Ostrc wind power plant will produce with eight wind turbines with a total installed capacity of 28.2 MW.

The planned annual production is 94 GW / h of electricity and it is sufficient to supply all homes in Posusje, Grude and Ljubuski.

According to the Feasibility Study, the value of the Ostrc wind farm project is 35 million euros and it will be the largest investment in one project in the County of West Herzegovina.

On behalf of the concession fee, Relaks will pay a concession fee of 2.5% of the total value of electricity produced, and the fee will be split into two equal parts between the cantons and the Municipality of Posusje.

 

 

 

Bosnian Muhamed Kahrimanovic currently holds 26 World Records

Million EUR for the Improvement of Tourist Offer Via Dinarica

Decrease of 73 Percent in Tourists Arrivals in Bosnia

Employers and Unions: An enormous Increase in Electricity Prices should not be allowed

Central Bank of BiH Becomes A Full Member Of An Important Global Network

TAGGED:#BiH#Herzegovina#hydroepectric#plant#Posusje
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Bosnia International Forum to connect Bosnia-Herzegovina and Diaspora
Next Article EUFOR Multinational Battalion (MNBN) conduct an Exercise securing the Weapon Storage Site
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The Day of Remembrance of the Victims of the Ustasha Crimes in the Jasenovac Camp marked in Donja Gradina
April 19, 2026
HR Schmidt: Respond decisively to Islamophobic Thetoric and Hate Speech
April 19, 2026
Sarajevo Cable Car resumes Service
April 19, 2026
Fuel never more expensive, House of Peoples to discuss Excise Taxes Tomorrow
April 19, 2026
EUFOR and Armed Forces BiH will Train Together in Manjaca
April 19, 2026
Prevot after Visiting Srebrenica: “I cannot stress enough how important it is to reject the Denial of War Crimes”
April 19, 2026
Mihael Stajnar is the Winner of the Tour of Bosnia and Herzegovina
April 19, 2026
EUFOR Commander hosts Belgian Foreign Minister in Camp Butmir
April 19, 2026
BiH Foreign Minister meets with OSCE Secretary General
April 19, 2026
Message of Coexistence Marking 102nd HVO Brigade Anniversary with Joint Prayers by Priest and Imam
April 19, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?