By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Wind Farm worth 35 Million Euros to be opened in Herzegovina
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Wind Farm worth 35 Million Euros to be opened in Herzegovina
BUSINESS

Wind Farm worth 35 Million Euros to be opened in Herzegovina

Published: January 18, 2020
Share
SHARE

 

The Relaks company from Posusje, owned by businessmen Veljko Loncar (Vokel) and Tomislav Maric (KTM Brina), is working on a project to build the Ostrc hydroelectric plant on the Ostrc mountain above Posusje. The project is in the phase of obtaining an energy permit.

So far, the CoE has been issued with a location and environmental permit, the Indikator reports, referring to Grude.com news portal. Wind power and direction have been continuously monitored and recorded for five years with devices mounted on a 84-meter-high measuring pillar on Ostrce.

Based on the obtained data, all the necessary studies and studies were done showing that the Ostrc site is one of the best locations for the construction of wind farms in BiH.

The electricity from renewable energy source-wind, Ostrc wind power plant will produce with eight wind turbines with a total installed capacity of 28.2 MW.

The planned annual production is 94 GW / h of electricity and it is sufficient to supply all homes in Posusje, Grude and Ljubuski.

According to the Feasibility Study, the value of the Ostrc wind farm project is 35 million euros and it will be the largest investment in one project in the County of West Herzegovina.

On behalf of the concession fee, Relaks will pay a concession fee of 2.5% of the total value of electricity produced, and the fee will be split into two equal parts between the cantons and the Municipality of Posusje.

 

 

 

Employees of Institutions of BiH to protest due to Non-Signing of Collective Agreement
Letter from a Serbian Officer in the BiH Armed Forces: We will not rush after Dodik
Weather Conditions did not cause an increased Number of Viroses
Kazim no longer thinks about Germany, he wants to stay in BiH
Gold Medal for BH Invention of construction Materials made of Waste
TAGGED:#BiH#Herzegovina#hydroepectric#plant#Posusje
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Bosnia International Forum to connect Bosnia-Herzegovina and Diaspora
Next Article EUFOR Multinational Battalion (MNBN) conduct an Exercise securing the Weapon Storage Site
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

“Mom, I Am Left All Alone”: Dino Beslic Breaks Hearts With Final Photo of His Parents
June 4, 2026
From Childhood Hobby to Football Time Capsule: Damir Bakrac’s 30-Year Panini Passion
June 4, 2026
Italy, the USA and France do not agree on the Election of a new HR in BiH
June 4, 2026
Yugo is coming back: Here’s what the new Model will look like
June 4, 2026
Two Members of BiH Presidency Hold Discussion in Front of Antonio Costa
June 4, 2026
What’s on BiH’s Eid Table? TasteAtlas Highlights the Country’s Most Beloved Festive Dishes
June 4, 2026
‘Safari in Sarajevo’ Book is a Reminder of the Importance of Humanity in Times of Temptation
June 4, 2026
The film ‘Pavilion’ by Dino Mustafić won the Award for the best Film at the Cine Paris Film Festival
June 4, 2026
Session of the Committee of the Regional Initiative for Migration, Asylum and Refugees held in Sarajevo
June 4, 2026
Bosnia and Herzegovina signs Memorandum of Understanding with Frontex
June 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?