By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Wind Farm worth 35 Million Euros to be opened in Herzegovina
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Wind Farm worth 35 Million Euros to be opened in Herzegovina
BUSINESS

Wind Farm worth 35 Million Euros to be opened in Herzegovina

Published: January 18, 2020
Share
SHARE

 

The Relaks company from Posusje, owned by businessmen Veljko Loncar (Vokel) and Tomislav Maric (KTM Brina), is working on a project to build the Ostrc hydroelectric plant on the Ostrc mountain above Posusje. The project is in the phase of obtaining an energy permit.

So far, the CoE has been issued with a location and environmental permit, the Indikator reports, referring to Grude.com news portal. Wind power and direction have been continuously monitored and recorded for five years with devices mounted on a 84-meter-high measuring pillar on Ostrce.

Based on the obtained data, all the necessary studies and studies were done showing that the Ostrc site is one of the best locations for the construction of wind farms in BiH.

The electricity from renewable energy source-wind, Ostrc wind power plant will produce with eight wind turbines with a total installed capacity of 28.2 MW.

The planned annual production is 94 GW / h of electricity and it is sufficient to supply all homes in Posusje, Grude and Ljubuski.

According to the Feasibility Study, the value of the Ostrc wind farm project is 35 million euros and it will be the largest investment in one project in the County of West Herzegovina.

On behalf of the concession fee, Relaks will pay a concession fee of 2.5% of the total value of electricity produced, and the fee will be split into two equal parts between the cantons and the Municipality of Posusje.

 

 

 

Consumer Prices recorded Decrease in Bosnia and Herzegovina
A Total of Twenty Patients died of Influenza in Republika Srpska
Ministry: Donated Vaccines should be approved by BiH Agency for Medicines
Sarajevo to host the Muslim-Jewish Conference with more than 100 Young Leaders participating
Deputy Director of the US Intelligence Agency CIA Vaughn Bishop arrived in Sarajevo
TAGGED:#BiH#Herzegovina#hydroepectric#plant#Posusje
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Bosnia International Forum to connect Bosnia-Herzegovina and Diaspora
Next Article EUFOR Multinational Battalion (MNBN) conduct an Exercise securing the Weapon Storage Site
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Nezir Pivic is the SDA Candidate for Prime Minister of the Federation of BiH
November 28, 2026
Why Igor Dodik’s Rise to Power Could Suit both Trump and Putin?
November 28, 2026
SDA: Amendments to the Law on RTRS Are Going to the Constitutional Court of BiH
November 28, 2026
Filipovic: The Next Meeting of the Leaders of the Brdo-Brijuni Process Could be Held in BiH
November 27, 2026
The Government of Japan grants 54,495 Euro for supporting Health Care Centre in Samac
November 27, 2026
CEC BiH Certifies Candidate Lists for Election of Delegates to FBiH House of Peoples
November 27, 2026
The Statehood Day of BiH in the UK Brings Together Diaspora and Guests from the Homeland
November 27, 2026
Interview: ZAVNOBiH Restored BiH’s Statehood, Today’s Generations Must Build a Future
November 27, 2026
New Composition of the Sarajevo Canton Assembly finalized
November 27, 2026
Strobe Talbott, a Key Figure in the process of Reaching the Dayton Agreement, passes away
November 27, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?