By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Wind Power Plant worth 60 Million BAM to be built in Berkovići 
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Wind Power Plant worth 60 Million BAM to be built in Berkovići 
BUSINESS

Wind Power Plant worth 60 Million BAM to be built in Berkovići 

Published: September 1, 2016
Share
SHARE

Sunset_at_Royd_Moor_Wind_FarmWind power plant Hrgud will be built in Berkovići. At yesterday’s session, the Council of Ministers of BiH adopted the Draft agreement on loan and project between KfW, Frankfurt am Main, Bosnia and Herzegovina, represented by the Ministry of Finance and Treasury (borrower), Republika Srpska, represented by the Ministry of Finance, and Elektroprivreda of Republika Srpska (agency for execution of the project) in the amount of 60 million EUR.

Wind power plant Hrgud will be built in the Municipality of Berkovići. It will have 16 wind turbines of total installed power of 48 MW with annual production of 126 GWh.

Elektroprivreda of Republika Srpska got concession for fifty years. According to the concession contract, BiH will get 3.6 percent of total income of wind power plant Hrgud.

A consultant selected by the KfW bank spent more than one year taking measurements and conducting analyses. According to the Director of Elektroprivreda RS Branislava Milekić, construction of the wind power plant should last for three years and, given the relatively high investments, the return on investment is expected in ten to twelve years.

(Source: akta.ba)

Slovenian Media: Bingo could buy Mercator
Economic statistics of Consumer Price Index in BiH
Mostar to get ‘Visitor Center’, 418,000 EUR worth Investment
934 Million EUR allocated for the Construction of Corridor 5C?
What is the Average Salary in Republika Srpska?
TAGGED:#construction#electricalenergy#Hrgud#investment#windpowerplant
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Sunny Weekend in Bosnia and Herzegovina? 
Next Article Nikolić and Vučić did not support the Referendum in the RS! 
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

The Council of Ministers of BiH grants Consent for Serbian Citizens to vote in BiH
October 20, 2026
BH Companies present their Products at the “SIAL Paris 2026”
October 20, 2026
Sarajevo Memorial Center Reacts to Billboards of Alija Izetbegovic in Lukavica
October 20, 2026
FUP searches the Premises of the FBiH Railways and the Federal Ministry of Transport and Communications
October 20, 2026
The Court of BiH acquits former OSA Agency Director of Charges of Abuse of Office
October 20, 2026
Authors of the Film about Alija Izetbegovic: Preserving Testimonies and preventing Historical Manipulation
October 20, 2026
Searches at Eight Locations in the Tuzla Area
October 20, 2026
Bronze Medal and three fifth Places for BiH Karate at the World Championship
October 20, 2026
SBiH: Cooperation with other Political Entities on Work Program Documents
October 20, 2026
An Orange Warning issued for the Area of Herzegovina
October 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?