By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Works on 20 million BAM worth Project of Water Supply of Gradacac to be started
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Works on 20 million BAM worth Project of Water Supply of Gradacac to be started
BUSINESS

Works on 20 million BAM worth Project of Water Supply of Gradacac to be started

Published: September 10, 2018
Share
SHARE

Signing of the first contract for beginning of works on the project “Water Supply Gradacac” (pipeline section) will take place today.

The works will be conducted from the constructed spring Domazic to the settlement of Vuckovci in the total length of about 4,000 meters, as announced from the Information Service of the Municipality of Gradacac.

The project “Water Supply Gradacac”, whose value amounts to about 20 million BAM, is financed from the EBRD and the grant funds of the Czech Development Agency and Sida.

With the realization of this project, the existing city network and sewerage system will be reconstructed as well, besides the supply of water to the southern part of the municipality.

(Source: biznisinfo.ba)

Former Workers of the Zenica Brown Coal Mine threaten Hunger Strike
Roundtable on the Development of Tourism as Generator of Employment in Canton Sarajevo
Trade in Goods from BiH to Kosovo fell by 99 Percent!
When is the best Time for Rafting on Tara River?
Drina River overflowed its Banks in Gorazde
TAGGED:#BiH#Gradacac#investment#project#realizationwater supply
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Royal Jordanian Airlines to introduce Line Amman-Sarajevo
Next Article Memorial to killed Croats revealed near Bugojno
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Interrupted Session of the House of Peoples of Parliamentary Assembly of BiH
June 4, 2026
Four People killed in Small Plane Crash in Croatia
June 4, 2026
Deputy COM EUFOR Highlights Importance of Joint Training and Interoperability
June 4, 2026
The Ministry of Economy of CS allocates more than 1.2 Million BAM for Women’s Entrepreneurship
June 4, 2026
“Mom, I Am Left All Alone”: Dino Beslic Breaks Hearts With Final Photo of His Parents
June 4, 2026
From Childhood Hobby to Football Time Capsule: Damir Bakrac’s 30-Year Panini Passion
June 4, 2026
Italy, the USA and France do not agree on the Election of a new HR in BiH
June 4, 2026
Yugo is coming back: Here’s what the new Model will look like
June 4, 2026
Two Members of BiH Presidency Hold Discussion in Front of Antonio Costa
June 4, 2026
What’s on BiH’s Eid Table? TasteAtlas Highlights the Country’s Most Beloved Festive Dishes
June 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?