By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 60 MW Photovoltaic Plant to be built in Bosnia and Herzegovina Southeast
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > 60 MW Photovoltaic Plant to be built in Bosnia and Herzegovina Southeast
BUSINESS

60 MW Photovoltaic Plant to be built in Bosnia and Herzegovina Southeast

Published: May 21, 2020
Share
SHARE

 

Vuk Hamović’s firm is signing the contract for a 60 MW photovoltaic system as bidding finished. The formal process for the Bileća solar power plant began in January following a request by EFT, Balkan Green Energy news portal reports.

The Government of the Republic of Srpska has decided to sign a contract with EFT International Investments Holding Ltd. for the construction of a 60 MW photovoltaic plant in Bosnia and Herzegovina’s southeast. The firm based in London is controlled by Vuk Hamović, who also trades in electricity and owns a coal-fueled thermal power plant of 300 MW with a mine. The local Ministry of Energy and Mining is tasked with formalizing the concession agreement for the Bileća solar power plant with EFT Group.

The process was started in January after the company requested it and bidding followed. In the public call issued in March, the ministry revealed it would award EFT a bonus in points of as much as 10% for the technical and financial proposal. The decision, dated April 30, was just published in the Official Gazette.

The concessionaire will have to pay a one-off fee of EUR 357,000 and 0.28 eurocents per each kWh the system generates, translating to EUR 2.8 per MWh.

The Government of the Republic of Srpska estimated the investment at EUR 35.7 million

The concession for the Bileća solar power plant will last 50 years.

 

Mostar Among the World Most Cost-effective Tourist Destinations
The Demolition of the Mosque near Konjic has been postponed, but Questions remain about the Legality of the Construction
One Coronavirus Positive Person died in Bosnia and Herzegovina
Analysis of a Meeting of BiH Presidency with Angela Merkel
Presentation of Results of Project to Improve Business Environment and Competitiveness in BiH
TAGGED:#BiH#Bileca#plant#RS#solar
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Bosnian Court confirmed indictment in Case of Labidi for Joining Foreign Paramilitary
Next Article Remembering Srebrenica condemns the Bleiburg Commemoration Event in Sarajevo
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Interview with Zvizdic: BiH cannot Progress on the European Path while SNSD is an important Political Factor
June 17, 2026
The National Assembly of Republika Srpska concluded its Special Session
June 17, 2026
The Football Team of BiH is leaving the Base in Salt Lake City
June 17, 2026
Dynamic Response 26-6: COM EUFOR Watches AF BiH Demonstrate Its Readiness
June 17, 2026
Rutte: The US is not withdrawing from Europe by announcing a Reduction in NATO Funding
June 17, 2026
Is the European Path or the European Halt?
June 17, 2026
Central Bank of BiH Unveils Commemorative Medallion Honoring the Nation’s World Cup Legacy
June 17, 2026
Three Persons arrested over Unauthorised Drug Production
June 17, 2026
The FBiH Government: The Federation does not block the return of VAT to Citizens
June 17, 2026
Miners in Kakanj received their Salaries and returned to Work
June 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?