By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Request submitted for Construction of Four mini-hydropower Plants on Sujica River
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Request submitted for Construction of Four mini-hydropower Plants on Sujica River
BUSINESS

Request submitted for Construction of Four mini-hydropower Plants on Sujica River

Published June 13, 2020
Share
SHARE

 

The M.H.E. Ltd. Tomislavgrad sent a request to the Ministry of Economy of Hercegbosna County (HBZ) for a concession for the construction of four mini-hydropower plants on the river Sujica in the municipality of Tomislavgrad, according to Fena news agency.

After analyzing the request, the Ministry of Economy of HBZ determined the justification and validity of the same from several aspects, ie economic-developmental, social and environmental, and according to the Law on Concessions of HBZ, the consent of the Municipal Council of Tomislavgrad was requested.

The Tomislavgrad Municipal Council will decide on granting the concession at its regular session on June 16.

The concession for the construction of four mini hydropower plants has been requested for a minimum period of 30 years, and the investor plans to build submersible turbines with one module output of 22 kW, turbine speed of 30 rpm, which achieves a total power of 88 kW for 4 pieces.

The expected production volume, depending on the hydrological year, is 539,616 kWH per year.

The investor states that the construction of a mini hydropower plant on the river Sujica will have a negligible impact on the environment, and the Ministry proposes that the amount of the concession fee is 1.0 percent of the produced electricity at current prices.

 

Unemployed Persons from Buzim started Skills Verification and Requalification for Future Jobs

Koster: Big Step backwards for BiH in Overcoming the Ethnic Division

Jewish Sarajevo: Streets and Palaces without which the City would be unrecognizable

EU Ambassador Lars-Gunnar Wigemark met with BiH Parliamentarians

Novalic: IMF does not only mean Favorable Loan but also Positive Changes in the Economy

TAGGED:#BiH#economy#HBZ#hydropower#mini#ministry#plantsconcession
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article 29 New Cases of COVID-19 Infection in Sarajevo Canton
Next Article 145 Cases of Coronavirus Infection confirmed in Canton Sarajevo
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Strait of Hormuz under Conflict Pressure: Asia fears Energy and Trade Shock
March 2, 2026
Trump: ‘Major’ Wave of Attacks on Iran coming soon
March 2, 2026
Hospital Services in Republika Srpska Surge by 139 Percent
March 2, 2026
EUFOR Commander meets with Belgian Ambassador to BiH
March 2, 2026
The ‘Dragons’ are ready for the Start of the Qualification and the Duel against Estonia
March 2, 2026
62 Thousand Poultry euthanized over Bird Flu in Republika Srpska
March 2, 2026
Iran’s Revolutionary Guard claims to have hit Benjamin Netanyahu’s Cabinet
March 2, 2026
EU Ministers’ Meeting in Cyprus postponed over Drone Attack
March 2, 2026
Hundreds of Thousands of Passengers stranded around the World
March 2, 2026
555 People have been killed so far in the American-Israeli Bombing of Iran
March 2, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?