The company “Krivaja Metali” from Zavidovići, in the sixth year after privatization, got the job of projecting, manufacturing and delivering of 20 tanks of liquefied petroleum gas volume per 150 cubic meters.
The “Natron Metals” in due time successfully completed and delivered to the Serbian company “Petrol LPG” from Belgrade the requested tanks, each with a diameter of three and 24 meters in length and weighing around 28 tons.
The total value is 1.626 million BAM, and the delivered reservoirs will be set in the new gas terminal in Smederevo.
The entire work is done according to the norms of the European Union, under the supervision and control of certified SGS Serbia, Directorate of Inspection of FB&H of the Inspectorate of FB&H.
(Source: Dnevni Avaz)