On Saturday, a contract for the construction of a capital project for the Bosnian-Podrinje Canton was signed in Gorazde. Namely, the contract is about the tunnel that will connect Sarajevo with this part of the Federation of Bosnia and Herzegovina (FBiH).
The construction of the tunnel will cost in total 81,8 million BAM.
The construction of the tunnel “Hranjen” represents a historic project for Gorazde, because the distance will be decreased from the current 95.6 kilometers to 56 kilometers.
After the construction of tunnel Hranjen, and given the quality of the new route, the ride between Sarajevo and Gorazde will last for 45 minutes instead of the hour and a half.
In the video below, you can see how the Tunnel Hranjen will look like: