By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Construction of Hilton Hotel in Sarajevo can Begin
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BH TOURISM > Construction of Hilton Hotel in Sarajevo can Begin
BH TOURISM

Construction of Hilton Hotel in Sarajevo can Begin

Published: July 13, 2016
Share
SHARE

hiltonThe notary contract in which this municipality sells 65 per cent of the land to Fatih Kol was signed yesterday in the premises of the Old Town municipality. The Mayor of the Old Town municipality, Ibrahim Hadžibajrić, said that Sarajevo is going to have a prestigious Hilton Hotel.

Kol finished all of the necessary procedures regarding property rights for 35 per cent of the building that was already there, and he has now received an additional 65 per cent of the land that was owned by the municipality.

“Before the war there were also tenants who used to have tenancy rights and Kol paid them. This 65 per cent of the land was sold for 3.600.000 BAM. The hotel will have the same dimensions and two underground floors for garages. The facade will be the same as before because the building is under state protection, while the interior will be adjusted according to their purpose,” said Hadžibajrić.

The building was shelled and burned down in 1993. Ever since then it has been standing as a mockery of the old part of Sarajevo, behind the Cathedral. As Kol stated for the press, the construction will start in September this year and it’s supposed to be completed in a year and a half.

“I hope this will be a good advertisement for the Old Town and Sarajevo. The workers will work in three shifts and I hope that works will be finished earlier. The value of the investment is 10 million Euros, not counting current expenses,” said Kol.

The current state of this object is very bad. The only things that remained of its construction are facade walls, panel above ground and basement, and construction of vertical communications. The mezzanine constructions of the first, second and third floor and a roof were burned down during the bombardment in 1992. The remains of construction were additionally damaged during the post-war years.

(Source: klix.ba)

 

The Number of Tourists visiting BiH increased by 20 Percent
The biggest Stone Ball in Europe already attracting Tourist from around the World
BiH Citizens have been banned from Traveling to Sweden
Tourist Season in Neum exceeded last Year’s Results
Visit the Real Gem of Bosnia and Herzegovina: Bosanska Krupa and Una River!
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article German with Bosnian Roots Promotes the Natural Beauties (gallery)
Next Article EBRD appoints 65 Million EUR for Roads in BiH?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

“Sarajevo’s Problem is not Scooters, but 40,000 Motor Vehicles”
September 22, 2026
Race for the Cure in Sarajevo: A Run and Walk for Life, Health, and Solidarity
September 22, 2026
Demographic Policy has made Siroki Brijeg a desirable Place to live
September 22, 2026
BiH National Team Begins Nations League Preparations with Training at Grbavica Stadium
September 22, 2026
Sarajevo to host 5th Vils Ultramarathon
September 22, 2026
Becirovic and Konakovic at the 81st Session of the UN General Assembly in New York
September 22, 2026
The Indictment for the Tram Accident in Sarajevo returned to the CS Prosecutor’s Office for Revision
September 22, 2026
Energy and Industrial Transformation in the Focus of the 4th Sarajevo Energy and Climate Week
September 22, 2026
Dodik: All Imposed Reforms and Solutions Must Be Annulled
September 22, 2026
Becirovic with the UN SG: The Resolution and the ‘Flower of Srebrenica’ Monument are a lasting Legacy
September 21, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?