By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Construction of Two Hydro Power Plants in Visegrad soon
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Construction of Two Hydro Power Plants in Visegrad soon
BUSINESS

Construction of Two Hydro Power Plants in Visegrad soon

Published January 14, 2020
Share
SHARE

 

The Government of Republika Srpska entity has decided to launch a concession procedure for the construction of two small hydropower plants in Visegrad, with an estimated investment value of about 3.12 million BAM.

According to the decisions of the RS Government, published in the RS Official Gazette, the construction of two small hydropower plants is planned, Crni Rzav with an estimated installed capacity of 0.3 megawatts and an estimated annual production of 1.5 gigawatts per hour and “Bijeli Rzav” with an estimated installed capacity of 0 , 3 megawatts and an estimated annual output of 1.9 gigawatts.

The construction of the small hydro power plant Crni Rzav is planned on a part of the watercourse of the river, near the village of Vardiste, while the construction of the Bijeli Rzav hydroelectric power plant is planned on a part of the watercourse near the border with the Republic of Serbia.

It was also stated that the value of Crni Rzav plant is about 1.66 million BAM, while the value of the small hydro power plant Bijeli Rzav is about 1.46 million BAM.

The initiative for the award of concessions for the construction of these two small hydropower plants was submitted by the company VG Ekoenergija from Visegrad. The director of the company, Marina Andric, told Glas Srpske that the company has extensive experience in investing in renewable energy.

“I expect that the concession will be awarded to us, and immediately after that we will start drafting technical documentation and providing loans for the construction of facilities. As good businessmen, we use European standards and modern technology in the construction of hydropower plants. All our facilities that are in use are used in accordance with the highest environmental and other standards, for the benefit of future generations,” Andric said.

She added that their goal is to follow the trends, using renewable energy sources to reduce the pollution of the planet, which has grown enormously.

The Republika Srpska government has authorized the Ministry of Energy and Mining to prepare tender documentation for the award of small hydro power plant concessions in Visegrad, EKapija business portal reports.

 

Exhumation in Vlasenica completed, exhumed 28 Remains

Elvedina Muzaferija carries the BH Flag at the Opening of the 23rd WOG in Pyeongchan

Remains of Three Persons found in the Mass Grave in Vlasenica

Body of a Newborn found on the Bank of Vrbas River

Bosnian Central Bank participates at Annual Meeting of the Bank for International Settlements

TAGGED:#BiH#hydropower#plants#river#visegradconcession
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article European Commission allocates 2 Million Euros for Western Balkans
Next Article Iranian Embassy in Bosnia-Herzegovina dismisses accusations that Soleimani planned Terroristic Attacks in BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Blockades, Lost Millions and Political Clashes stall BiH’s EU Path
April 25, 2026
MoI CS: Suspect arrested for Shooting in BiH’s Capital
April 25, 2026
Blanusa: EPRS is a Hostage of Private Interests and someone must answer for the Losses
April 25, 2026
Warning to BiH Citizens about fake Messages and Misuse of the Name IDDEEA BiH
April 25, 2026
New Steelwork Zenica will not shut down completely, reorganization will follow
April 25, 2026
The First Ukrainian Children’s Library opens in the Bosnian House in Birmingham
April 25, 2026
BiH FM on an official Visit to the People’s Democratic Republic of Algeria
April 25, 2026
It is known when Dzeko could return to play
April 25, 2026
Konakovic – Berset: BiH’s strong commitment to the fundamental values ​​of the Council of Europe
April 25, 2026
Srebrenica Associations are worried about the possible Release of Mladic for Treatment
April 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?