By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: EU allocates Fifteen Million Euros for Construction of New Section of Corridor 5C
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BH & EU > EU allocates Fifteen Million Euros for Construction of New Section of Corridor 5C
BH & EU

EU allocates Fifteen Million Euros for Construction of New Section of Corridor 5C

Published August 2, 2019
Share
SHARE

The agreement on the European Union grant of €15 million was signed today to co-finance the new section of Corridor Vc between Johovac and Rudanka, near Doboj, between Bosnia and Herzegovina and the European Bank for Reconstruction and Development (EBRD).

With this new section of Corridor Vc between Johovac and Rudanka with an approximate length of 6.1 km and two interchanges the completion of Bosnia and Herzegovina’s main transport corridor is coming a step closer. The EU grant worth €15 million will be channelled through the Western Balkans Investment Framework (WBIF) and will complement a loan by the EBRD of up to €70 million.

Head of the Delegation of the European Union and EU Special Representative in Bosnia and Herzegovina Ambassador Lars-Gunnar Wigemark said: “This €15 million grant is one out of 11 projects funded by the European Union in Bosnia and Herzegovina as part of the Connectivity Agenda with a total of €217 million approved for BiH so far. At the recently held Western Balkans 6 Summit in Poznan, Poland, the EU endorsed a new Connectivity package that fulfils our € 1 billion pledge to the Western Balkans. BiH is a large recipient of these grants.  Four of out of twelve new projects approved in Pozan are in BiH. These grants will be leveraging additional investments to build infrastructure to the benefit of citizens and the economy“.

Corridor Vc is the main international transport corridor in Bosnia and Herzegovina, which support economic development and contribute to regional integration by improving connectivity within Bosnia and Herzegovina and with its neighbouring countries.

Ian Brown, Head of EBRD Office in Bosnia and Herzegovina, said: “We are pleased to sign this agreement today which illustrates the good progress that is being made with the construction of Corridor Vc. We are confident that establishing better links within the country and connecting it better with Europe will serve the cause of deeper integration, and not only economically.”

The new motorway section will connect to the Banja Luka – Doboj motorway and complement other current and planned investments in the northern and southern parts of Corridor Vc in Bosnia and Herzegovina. It will improve travel conditions, reduce congestion and provide local employment during the construction phase. The new motorway will also improve road safety as it will reduce the heavy traffic that currently passes through the town of Doboj and local villages.

„Such agreements help boost local companies, create new jobs, and eventually enable us to move towards the EU in terms of transport links. As a result, we will have new motorways, bridges and faster links with the rest of the world, and all this will result in further economic growth,” said Vjekoslav Bevanda, Minister of Finance and Treasury of BiH.

Corridor Vc is expected to be completed by 2030 with the total cost estimated to be approximately €4 billion. Under the Connectivity Agenda, the European Union has set aside up to €1 billion in grants for the period of 2014-2020 through the WBIF to complement the loans from international financial institutions.

EU and B&H Working Together For Better Social Inclusion of Roma

Twenty-Sixth Anniversary of Markale Massacre to be marked Today

BH Informaticians won two Bronze Medals in Romania

Sarajevo Mountain Rescue Service rescues Dutch citizens on Visocica

BiH Presidency Member: I will not allow Division of BiH!

TAGGED:#agreement#BiH#EBRD#signingEUgrant
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Migrants help Residents of Kljuc Municipality to mow the Grass and Carry Hay
Next Article Two Despot Combat Armoured Vehicles to arrive in Republika Srpska Entity Today
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Second Phase Of “Energy Efficiency In Public Buildings Of Sarajevo Canton” Project Successfully Completed
March 27, 2026
Orange Meteoalarm Warning Issued For Wind, Rain And Snow Across BiH
March 27, 2026
CBBiH: Overall Inflation could accelerate in the Second Quarter of this Year
March 27, 2026
Red Bull Cliff Diving returns to Mostar
March 27, 2026
Dragons arrive in Sarajevo, Barbarez expects Success with Italy
March 27, 2026
RS Government: Citizens will be refunded the entire Amount of Excise Duty on Fuel
March 27, 2026
Alajbegovic signs for Bayer Leverkusen
March 27, 2026
Identity of Man who became Symbol of BiH’s Victory in Cardiff revealed
March 27, 2026
NATO Report for 2025: A Historic Year for the Alliance with a Strong Focus on BiH and WB Stability
March 27, 2026
BiH in the Heart of London: Independence Day Marked in the UK Parliament for the Fifth Year in a Row
March 27, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?