By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: First Passengers passed through the longest Tunnel in the World
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > WORLD NEWS > First Passengers passed through the longest Tunnel in the World
WORLD NEWS

First Passengers passed through the longest Tunnel in the World

Published December 12, 2016
Share
SHARE

tunnel switzerlandAfter 17 years of construction and 12 billion EUR invested, the first passenger speed train passed through the Gotthard Tunnel, which passes through the Swiss Alps.

The train passed through the longest tunnel in the world (57 kilometers), which was officially opened six months ago. The opening was attended by the German Chancellor Angela Merkel, French President Francois Hollande and the Italian Prime Minister Matteo Renzi.

First speed train EC11 embarked on the journey at 6:09 am from Zurich to Lugano. It took the train 20 minutes to pass the tunnel because the speed of the train is 250 kilometers per hour, thus shortening the journey from the north to the south of Switzerland by half an hour.

Additional 30 minutes of the journey will be saved when the Ceneri tunnel opens in 2020. Then the journey from Zurich to Milano will last around two hours. Fifty passenger trains and 260 freight trains will pass through the tunnel every day, which is twice more than today.

The project cost more than 12 billion EUR and engineers had to dig deep under the ground to break through different layers of stone, hard as granite and soft as sugar. More than 28 million tons of stone were dug out and nine workers were killed during the construction. The biggest depth is 2.300 meters, which makes it the deepest tunnel as well.

The main goal of the construction of this tunnel was to increase freight railway traffic in Switzerland and reduce the number of accidents caused by freight trucks. It is expected that the number of passengers in railway traffic will increase from the current 9.000 to 15.000 by 2020. The tunnel is financed from the VAT on fuel, tolls for freight vehicles, and a state loan which will be repaid within ten years.

This project was supported by the European Union countries. At the opening, Merkel said that this tunnel is the symbol of connecting people in Europe.

“The tunnel will connect people and cultures and reinforce the existing connections. I think this is beautiful,” said Merkel.

(Source: klix.ba)

Borrell: Disinformation in Times of the Coronavirus can kill

Members of the EUFOR reserve Forces arrived already in Bosnia and Herzegovina

The Residents of Sarajevo were surprised by an unusual Sight in the Sky

Decrease of Cross-Border Traffic in Bosnia and Herzegovina recorded

Israel accuses Iran of approaching ‘point of no return’

TAGGED:#longest#opening#railway#speed#Switzerland#tunnelpassengers
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Confirmed: No BH Citizens among the Victims in the Terrorist Attack in Istanbul
Next Article Undestined Football Player becomes the Co-Owner of the Biggest Company in Canada
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The Fourth Salamander Trail to Be Held in Rudo at the End of October
May 4, 2026
Over 65% of Domestic Violence Verdicts End in Suspended Sentences Despite Brutal Abuse Cases
May 4, 2026
Over 5 Million BAM Allocated for Social Protection Programs in the Federation of Bosnia and Herzegovina
May 4, 2026
Who Benefits, Who Pays? Seized Assets Debate and Gray List Threat Shake BiH
May 4, 2026
Shutting Down Industrial Plants Directly Jeopardizes the Survival of Railways in BiH
May 4, 2026
Peace March in Memory of More Than 20,000 Expelled Bosniaks and Croats from Doboj
May 4, 2026
The Retrial of Ramiz Durakovic for War Crimes begins at the Court of BiH
May 4, 2026
Oil Prices fall slightly
May 4, 2026
A dangerous Virus is spreading on a Dutch Cruise Ship
May 4, 2026
Dino Beganovic’s Incredible Result on His Formula 2 Debut in the U.S.!
May 4, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?