By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Five Solar Power Plants are being built in the BiH City of Gorazde
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Five Solar Power Plants are being built in the BiH City of Gorazde
BUSINESS

Five Solar Power Plants are being built in the BiH City of Gorazde

Published: October 11, 2023
Share
SHARE

At the last session, the Government of the Bosnian-Podrinje Canton (BPC) Gorazde approved the granting of a concession through a self-initiated offer for the construction of solar power plants at the locations of FNE Jahorina, Jahorina 1, FNE Jahorina 2, FNE Vranovina and a wind farm at the Kacelj location.

With this decision, the relevant ministry is given the opportunity to issue locations for the construction of solar power plants, and all interested entities can submit their self-initiated proposals for granting concessions to the address of the ministry.

Minister Zijad Briga said that an offer from a business entity from abroad arrived in March, in which, along with a detailed conceptual design, the intention to build several solar power plants and one wind farm was expressed.

Briga added that this should be the largest project of its kind in Bosnia and Herzegovina (BiH) with a capacity of over 800 MWH, and for the sake of comparison, he stated that the maximum capacity of the Visegrad Hydroelectric Power Plant is 350 MWH per year.

“What is important for BPC Gorazde is that after the completion of this project, the income of the canton based on concessions would be significantly increased, which would solve to a good extent the financial problems that the canton has. For example, when the BPC Government made this decision, a contract was signed with a German company in Sokolac, and as it was officially announced, the concession fee to the municipality of Sokolac from just one solar power plant should amount to around 800.000 BAM per year,” Briga explained.

With this decision, the BPC government gave the Concessions Commission the opportunity to start negotiations with a company that is already interested, and in the meantime, there is still the possibility for all others who are interested to present their offers, ekapija reports.

Slovenians are looking for Drivers and Construction Workers from BiH
Sarajevo Airport registers busiest Month on Record
International Trade Fair – Mostar 2015 opened
Economy under the Burden of Levies, Workers paid below any Average
ZEPS gathered more than 600 Exhibitors from all around the World!
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Presidents without Opponents – Democracy in a BiH Way
Next Article Meeting of the Contact Group for the Defense of Ukraine
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

A Strong Message from Germany: “Dodik and Trump Administration Pose the Main Threat to BiH”
June 25, 2026
Balkan Gets a New “Country”
June 25, 2026
The New Great Game in the Balkans
June 25, 2026
Key Financial Institutions Send a Joint Message: Retail Deposits Are Safe, BiH Financial Sector Remains Stable
June 25, 2026
BiH among the Top Polluters, Thermal Power Plants for Years Breach the Emission Limits
June 25, 2026
Deputy Minister of FA participates in the ASPEN Working Group for the WB
June 25, 2026
Bosnia and Herzegovina officially among the 32 best Teams in the World!
June 25, 2026
Hurtic at the Audience with Pope Leo XIV – Messages of Peace and an Invitation to visit BiH
June 25, 2026
BiH Team to present the Country at prestigious European Geography Olympiad
June 25, 2026
Barbarez: I am convinced that this National Team is just at the Beginning
June 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?