By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Five Solar Power Plants are being built in the BiH City of Gorazde
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Five Solar Power Plants are being built in the BiH City of Gorazde
BUSINESS

Five Solar Power Plants are being built in the BiH City of Gorazde

Published: October 11, 2023
Share
SHARE

At the last session, the Government of the Bosnian-Podrinje Canton (BPC) Gorazde approved the granting of a concession through a self-initiated offer for the construction of solar power plants at the locations of FNE Jahorina, Jahorina 1, FNE Jahorina 2, FNE Vranovina and a wind farm at the Kacelj location.

With this decision, the relevant ministry is given the opportunity to issue locations for the construction of solar power plants, and all interested entities can submit their self-initiated proposals for granting concessions to the address of the ministry.

Minister Zijad Briga said that an offer from a business entity from abroad arrived in March, in which, along with a detailed conceptual design, the intention to build several solar power plants and one wind farm was expressed.

Briga added that this should be the largest project of its kind in Bosnia and Herzegovina (BiH) with a capacity of over 800 MWH, and for the sake of comparison, he stated that the maximum capacity of the Visegrad Hydroelectric Power Plant is 350 MWH per year.

“What is important for BPC Gorazde is that after the completion of this project, the income of the canton based on concessions would be significantly increased, which would solve to a good extent the financial problems that the canton has. For example, when the BPC Government made this decision, a contract was signed with a German company in Sokolac, and as it was officially announced, the concession fee to the municipality of Sokolac from just one solar power plant should amount to around 800.000 BAM per year,” Briga explained.

With this decision, the BPC government gave the Concessions Commission the opportunity to start negotiations with a company that is already interested, and in the meantime, there is still the possibility for all others who are interested to present their offers, ekapija reports.

Warning from the USA to Banks in Bosnia and Herzegovina
What is the Number of Users of E-Banking in Bosnia and Herzegovina
Regional Energy Forum Tuzla to be held in Tuzla in May
Bosnian Prosecutors Office issues Indictment for Persons who damaged Budget for over 21,000 BAM
Employers called to allow Working Parents in Sarajevo to be with first-graders on the first Day of School
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Presidents without Opponents – Democracy in a BiH Way
Next Article Meeting of the Contact Group for the Defense of Ukraine
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

UEFA appoints Referees for the Match Bosnia and Herzegovina – Sweden
September 30, 2026
Canton Sarajevo establishes a Protocol on urgent Care of Patients
September 30, 2026
Fourth Decade of Success: Preserving Bosnian Language and Connecting Generations in the Heart of the United Kingdom
September 30, 2026
BiH Foreign Minister to participate in the Ministerial Meeting of the Berlin Process
September 30, 2026
The Poles “Fear” the Dragons: Bosnia and Herzegovina Is Growing into the Second Force in Group IV
September 30, 2026
Historic Success for Adnan Alagic: Three Gold Medals, Fifth World Champion Title, and Athlete of the Year Recognition
September 30, 2026
The Border Police of BiH receives a renovated Patrol Vessel from the USA
September 30, 2026
Council of Europe Postpones Decision on Resolution Addressing the Sarajevo Safari
September 30, 2026
Two-day Session of the HJPC of Bosnia and Herzegovina begins Today
September 30, 2026
Poverty is rising in BiH; nearly 19,000 People come to Soup Kitchens for a Meal
September 30, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?