By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Five Solar Power Plants are being built in the BiH City of Gorazde
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Five Solar Power Plants are being built in the BiH City of Gorazde
BUSINESS

Five Solar Power Plants are being built in the BiH City of Gorazde

Published: October 11, 2023
Share
SHARE

At the last session, the Government of the Bosnian-Podrinje Canton (BPC) Gorazde approved the granting of a concession through a self-initiated offer for the construction of solar power plants at the locations of FNE Jahorina, Jahorina 1, FNE Jahorina 2, FNE Vranovina and a wind farm at the Kacelj location.

With this decision, the relevant ministry is given the opportunity to issue locations for the construction of solar power plants, and all interested entities can submit their self-initiated proposals for granting concessions to the address of the ministry.

Minister Zijad Briga said that an offer from a business entity from abroad arrived in March, in which, along with a detailed conceptual design, the intention to build several solar power plants and one wind farm was expressed.

Briga added that this should be the largest project of its kind in Bosnia and Herzegovina (BiH) with a capacity of over 800 MWH, and for the sake of comparison, he stated that the maximum capacity of the Visegrad Hydroelectric Power Plant is 350 MWH per year.

“What is important for BPC Gorazde is that after the completion of this project, the income of the canton based on concessions would be significantly increased, which would solve to a good extent the financial problems that the canton has. For example, when the BPC Government made this decision, a contract was signed with a German company in Sokolac, and as it was officially announced, the concession fee to the municipality of Sokolac from just one solar power plant should amount to around 800.000 BAM per year,” Briga explained.

With this decision, the BPC government gave the Concessions Commission the opportunity to start negotiations with a company that is already interested, and in the meantime, there is still the possibility for all others who are interested to present their offers, ekapija reports.

Ecocide in BiH: The Authorities neglected the Rivers for 305 Million BAM
Foreign Exchange Reserves of the Central Bank of BiH reach 19.9 Billion BAM
What is the Number of Employed Persons in BiH?
Tactile Paths and Audible Signals to facilitate Movement for Blind Persons in Sarajevo?
Bosnian won Gold Medal in Russia for his Three-Phase Hybrid Tesla Rotary Engine Project
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Presidents without Opponents – Democracy in a BiH Way
Next Article Meeting of the Contact Group for the Defense of Ukraine
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

National Delicacies and Unique Treasures Today at the Diplomatic Winter Bazaar
November 21, 2026
‘In the Silence of the Orient’ brings Refreshment to the Domestic Literary Scene
November 21, 2026
Barbarez: It is a Privilege to have the Opportunity to compete against the best
November 20, 2026
Blanusa: SDS will not be Part of the RS Government
November 20, 2026
BiH supports the EU Position on establishing a Nuclear-weapon-Free Zone in the Middle East
November 20, 2026
The Prosecution is asking a Ban from performing Duties for Niksic, Isak and Munjic
November 20, 2026
The City of Sarajevo after being deleted as the Owner of the City Hall: We are not here illegally, we have invested Millions in the Renovation
November 20, 2026
Regional Agreement Signed, Seasonal Ski Passes from BiH Will Be Valid in Serbia, Slovenia, and Montenegro
November 20, 2026
Senate Committee Approves Ronald Johnson’s Nomination for the US Ambassador to BiH
November 20, 2026
World Phenomenon in Herzegovina: 136 Human Fish found in Golubinka Cave
November 20, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?